Tuesday, November 15, 2005 - The small freight elevator (#6) at the MEB has been temporarily repaired and is operating.
- The contractor began removing flood-damaged furnishings & equipment from the Nursing/Allied Health Bldg.
- Work began today on a small contract to replace the gas trains on the two MEB boilers.
|