Wednesday, November 30, 2005 - The contractor responsible for removal of flood damaged equipment is removing animal care cages at the CSRB.
- The P3 lab now has emergency power available to it. Preparations are underway by LSUHSC staff to allow for decontamination of the lab.
- The two new contracts have been awarded for the removal of flood damaged carpet and semi-porous building materials; one to AAA Environmental for the contract for flooded 1st floors and basements (except the Dental School) and one to Zimmer-Eschette for the Dental School basement space.
|