Louisiana State University Health Sciences Center Administration & Finance
 

Thursday, January 19, 2006

  • All of the flood damage building debris has been removed from the basement at 1542 Tulane Ave. Work under the same contract continues at Stanislaus Hall.
  • CSRB Switchgear: Repairs to the motor control center are complete.
  • Residence Hall Switchgear: Power to the Residence Hall power will be shut down starting Friday, 1/20 to complete additional repairs. The building power is expected to be restored on Monday, 1/23.
  • Lions Eye Center Switchgear: Two transformers have been removed, refurbished and reinstalled on the 1st floor.
  • Bids were received for the permanent repairs to emergency generators serving the downtown campus buildings and the responses are being evaluated.