Monday, August 07, 2006

  • NOTICE: We need to have an emergency shutdown of the domestic hot and cold water for the entire MEB starting at 5:30 PM this evening, August 7th and lasting until midnight. We have a leak that must be repaired immediately and there is no local shutoff valve. This outage only affects the domestic water hot and cold. This means that there will be no water at any sinks, showers or toilets in the entire MEB while the water is off. Walk-in coolers will be checked to make sure that they stay on line the entire time.
  • The casework for the Gross Anatomy and Swing Labs was delivered to the site today. The installation will begin immediately.
  • The contractor at the Dental School is taping and floating the drywall for the walls of the new switchgear room. The air compressor is also ready to operate.
  • The new air handling unit for MEB second floor lobby is being tested and balanced.