Louisiana State University Health Sciences Center Administration & Finance
 

Monday, September 18, 2006

  • The MEB atrium We Proudly Brew Starbucks coffee kiosk reopened this morning. Service will be available from 7:00 am to 4:00 pm daily, Monday through Friday.
  • 1542 Tulane Temporary Repair Project:
    • Two pumps and an exhaust fan were delivered today. 
    • The contractor is cleaning the debris out of the basement and continuing to close up panels. 
    • Entergy has installed their current transformers for the metering. 
  • The window repair contractor has completed installation of the doors at Residence Hall.  The contractor also removed the old doors that were left on the mezzanine level. 
  • Work at the Dental School Clinic and Administration Buildings continues.
    • Pipe Insulation labeling/identification continues.
    • Incinerator gas lines are being drained.  The plan is to ignite the burner later this week to test its operation.
    • The medical gas cylinders have been connected to the oxygen & nitrous oxide manifolds.
    • The contractor has delivered block materials to the jobsite to begin repairs to the damaged block walls.
    • The contractors are re-installing the cabinets and miscellaneous fixtures in Lab 6314B. These items were removed to allow the remediation contractor to address the molded walls in this area.
    • The contractor has begun removal of the chilled water pump motors as required by the change order that includes the repair of the Motor Control Center.