Louisiana State University Health Sciences Center Administration & Finance
 

Thursday, November 30, 2006

  • All of the new light poles have been installed at Student Parking Lot #2.  The final cleanup around the light pole bases and along the trenches is almost complete.
  • The elevator contractor was at 1542 Tulane working on repairs to the freight elevator.
  • Representatives from the States excess insurance carriers completed their inspections of the downtown campus buildings and the Dental School campus buildings. 
  • Repairs to the interior of one of the CSRB elevator cabs were completed today.  The contractor has begun working on the interior of the next elevator.
  • Power to the Dental School Clinic and Administration buildings was interrupted for approximately an hour today, while service (an adjustment) was performed on a switch on the temporary switch gear. 
    • The contractor providing the dehumidification equipment was on site to make some adjustments to their dryers and to service all them.