Thursday, February 22, 2007
- Additional floor tile was installed on the ramp from the MEB atrium leading to the 3rd floor elevator lobby in the Nursing/Allied Health Building and in a portion of the elevator lobby.
- All of the new light fixtures have been installed and are operating in the atrium.
- The old motor control center has been removed from the Dental School Power Plant.
- The remaining ceiling tile has been removed from the 4th floor of the Administration Building at the Dental School . This completes the removal of all ceiling tile in both buildings.
|