Wednesday, April 04, 2007 Dental School :
- Cingular removed some towers from the outside wall of the penthouse. They have a contractor patching the holes and will finish the patching tomorrow.
- Pflueger Electric started the disassembly of the old Motor Control Center. At 4:00 PM they started the installation of the new one.
- Schindler worked on the passenger elevators in the Clinic Building .
- Zimmer has removed all of the ceiling grid from the 5th floor of both buildings.
1542 Tulane:
- Ordes Electrical continues to install 4" conduit to service the additional switch gear.
- Stratos Elevators was working on the cab of Elevator #3.
- Arc Mechanical worked on the repairs to the steam station.
|