Tuesday, May 01, 2007 Dental School :
- ADS systems serviced the fire alarm panel on the 2nd floor that had a trouble signal. The tech replaced a faulty circuit board then tested the unit and ran it through its cycle.
- Zimmer is working on the 4th floor of the Administration Building removing the debris from the demolition in that area.
- Boe-Tel has moved the tray that was placed in front of the dumb waiter doors. They continue to install cable trays and removing the old network cable.
- Schindler Elevator worked on Elevator # 4 because it was repeatedly stalling out.
- AT&T installed the remaining parts that were needed to get the phone line for the elevator. The technician put in work order to make that connection.
1542
Tulane Ave.:
- Ordes Electrical is removing old motor controls in another section of the engine room to prepare for new motor controls to be installed.
- Stratos Elevator is continuing with the installation of safeties on Elevator # 3.
- Arc Mechanical is still working on the ETS cabinets.
|