Louisiana State University Health Sciences Center Administration & Finance
 

Friday, May 18, 2007

NOTICE: There will be a complete power shutdown in the Nursing/Allied Health Building starting at 6:00 PM this evening and lasting until about midnight.  A short in a power feed to the air conditioning riser has necessitated that these wires be replaced.  We have been able to get a commitment from a contractor to have this work done this evening.  This outage will interrupt elevator service, medical air, vacuum, domestic water service and air conditioning, as well as all power receptacles in the building and any walk-in freezers or coolers.  Please do not attempt to use any water at any faucets, or use any toilets during this outage.  Also, the only lighting available will be emergency lights. Your patience during this repair is greatly appreciated.

Dental School :

  • Adco Boiler was onsite and serviced the temporary boiler.
  • Zimmer is cleaning all surfaces on the 2nd floor of the Clinic Building.
    • They are painting the stairwells in the Administration Building.
    • They are also cleaning the ducts on the 3rd and 4th floors.
  • Demolition continues in the Administration auditorium. 
  • Pflueger started running a 4 inch conduit on the second level of the Power Plant.
  • Schindler worked on the electronics in the elevator control panels in the Administration Building.
  • Boe-Tel continues to install wire mold and network jacks for the 5th floor
    • They are continuing to install additional cable trays.

1542 Tulane Ave.:

  • Ordes Electrical is finishing work on the new breaker panel in the basement.
  • Stratos Elevator is still installing communication cable in Elevator #3. 

Cafeteria Project: 

  • The wall separating the cafeteria from the 3rd floor MEB hallway has been completely demolished.