Friday, September 28, 2007 Dental
School:
- The
dry wall on all of the 1st Floor walls in the Clinic Building have been taped
and floated and most are painted
- The
curved wall at the reception desk has not been painted at this time.
- The
ceiling grid is being installed throughout 1st floor.
- Landis
has completed the punch list items on the Central Sterilization project and the
architect will verify.
- The
valves for the sterilizer were repositioned and the additional air line was
installed.
- Entergy
installed the electric meter and restored the service for the parking lot
controls.
1542
Tulane Ave.:
- Stratos
Elevator started installing the door guides for Elevator #8 on floors 6 through
8.
|