Friday, November 30, 2007 1542 Tulane
Ave.:
- Ordes Electric continues to install components of the PLC which control the Entergy Transfer Station.
- ]Stratos Elevator continues to make repairs to Elevators #1 and #7.
- The contractor is also replacing the hoist cables on Elevator #2.
- Final Remediation and Duct Cleaning:
- Zimmer-Eschette started cleaning the ducts on the 7th floor.
- They have finished removing the damaged carpet on the 7th floor. ]
- Zimmer continues to remove debris from the 4th floor.
- The contractor finished cleaning Suite 123 and is awaiting a visual inspection.
- The contractor started cleaning Suite 122.
- The test of the building fire pump was successfully completed today.
|