1542 Tulane Ave. :

  • Zimmer-Eschette continues to clean the corridor and elevator lobby on the 1st floor in the old section of the building.
  • The painting contractor continues painting the offices along the center corridor on the 1st Floor.
  • The contractor finished trimming and installing the edge and corner ceiling tiles on the 5th Floor.
  • Royerre Commercial Carpet crews continue to install new carpet tiles, transition strips, and cove base on the 7th Floor and on the 4th Floor.
  • Boe-Tel continues terminating the station cables in the offices on the 3rd Floor along Tulane Ave.
  • Trison Construction finished installing the new sprinkler heads, walls, and plywood backboard for the network closet on the 4th Floor.
  • Herman Miller Group continues to stage and install furniture in the offices on Floors 5 through 8.
    • The contractor continues to set up and install furniture in the offices along the center corridor on the 7th Floor.

MEB Roof Replacement:

  • Crawford started installing the Mineral Surface Modified Cap sheet on the main roof above the loading dock.
  • The installation of Mineral Surface Modified Cap sheet on all the penthouse roofs has been completed.

Lions/LSU Clinic Permanent Repairs and Mitigation:

  • CMI is framing the new interior walls on the 6th and 7th Floors.
  • They are roughing in the electrical wiring on the 7th Floor.
  • They continued to remove and clean the windows on the 1st Floor and they are working on the metal casing around the windows.

Dental School :

  • Zimmer began demolishing the Auto Shop (Bldg. #141) concrete slab.
    • They started the demolishing the HDC Storage Bldg.  (#101A).
  • Needham Roofing removed 5 squares of  old roofing material from the Power Plant and installed the new insulation, decking and the granulated 2nd ply material. 
  • Schindler is completing their punch list items on the newly certified Elevator #8.
    • They also worked on wiring the controller for the freight elevator.

Exterior Lighting Project:

  • Frischhertz is installing conduit and wire for lights that will be installed under I-10 in the Residence Hall parking lot.