1542 Tulane Ave. :

  • Stratos finished installing the whisper-flex cable for Elevator #7.
  • The Herman Miller Group is assembling and installing new furniture on the 5th and 6th Floors.
  • The contractor is priming the construction walls on Floors 1 through 4.
  • Merit Sprinkler completed the repairs for the dry-pipe system on the 8th Floor and has returned the system to service.
  • Boe-Tel is installing the telecommunication ground wires for the network closets on the 1st, 3rd, and 4th Floors.