Louisiana State University Health Sciences Center Administration & Finance
 

Monday, June 23, 2008

1542 Tulane Ave. :

  • Stratos continues to wire the penthouse controller for Elevator #7.
  • Trison Constructors finished sealing the plaster ceilings in the 1st, 2nd, and 3rd Floor elevator lobbies in the old section of the building.
    • They continue to install painted ceiling tiles to match the existing finish in the 1st, 2nd, and 3rd Floor in the elevator lobbies.
  • Premiere Source Inc. is detailing the baseboards on the 5th Floor.

Dental School :

  • Premier Source has started honing the terrazzo on the 4th Floor crossover where the temporary food service is located.