Monday, June 23, 2008 1542 Tulane Ave. :
- Stratos continues to wire the penthouse controller for Elevator #7.
- Trison Constructors finished sealing the plaster ceilings in the 1st, 2nd, and 3rd Floor elevator lobbies in the old section of the building.
- They continue to install painted ceiling tiles to match the existing finish in the 1st, 2nd, and 3rd Floor in the elevator lobbies.
- Premiere Source Inc. is detailing the baseboards on the 5th Floor.
Dental School :