Monday, September 15, 2008
1542 TULANE AVE.:
-
General contractor continued demolition in the 3rd floor annex.
-
Elevator contractor continued work on elevator #4.
-
Lighting contractor installed new light fixtures in the 1st floor Family Medicine offices.
-
Painting contractor continued painting stairwell and hallway ceilings.
-
Security contractor installed card reader for the front door access control and made final preparations for installation of new cameras at several locations.
-
Facility Services continued installing new fan coil units in 615, 616, and 617. Work continued roughing in plumbing in the 6th and 7th floor lounges for the new kitchenettes.
-
ORM insurance adjusters toured the building to document Hurricane Gustav damage.
DENTAL CAMPUS 6th and 8th FLOOR RENOVATIONS:
-
Mechanical Contractor continues to core in room 8405.
DENTAL CAMPUS AUDITORIUMS A & B RENOVATIONS:
-
Contractor continues to construct framing for ceiling in Auditorium B and is laying-out framing for the ceiling in Auditorium A.
LANDSCAPING & EXTERIOR WORK:
-
Landscaping contractor replanted storm damaged trees and reinstalled support cables.
LIBRARY COMMONS:
-
Plumbing contractor completed vent piping.
-
Electricians continue to install light fixture frames.
-
Contractor framed knee wall nearest to stairwell.
LIONS BUILDING MITIGATION:
- Mechanical subcontractor is running lines for new Med Gas on the 6th floor simulation rooms; running supply duct on Bolivar/Gravier side of 6th floor; insulating heating hot water lines on Bolivar/CSRB side of 6th floor; insulating supply duct on Gravier side of 6th floor; rerouting existing waste lines below new ceiling height on 6th floor; and piping in the AHU in mechanical room on 1st floor on the Gravier/Bolivar side of the building.
- Electrical subcontractor is terminating the wire to new panel boxes on the 2nd floor in new electrical room on the CSRB side; running new wire to electrical panels on the S. Preiur side of the building; and installing outlets in new lab area on the 7th floor.
- Iron subcontractor was rained out today.
- Contractor is painting the walls on new lab on 7th floor.
MEB 2nd FLOOR LOBBY RENOVATION:
-
Electrical subcontractor is running wire for outlets in new walls for medical and campus stores.
MDL-5 LAB RENOVATION:
-
Contractor continues installing casework (unistrut frame), installing LCD panel displays, and reinstalling gas line.
MEB 4th FLOOR CEILING REPLACEMENT:
- Contractor installed all of the fire speakers and continues installing ceiling tiles.
RESIDENCE HALL LOBBY EXPANSION:
- Facility Services relocated pool table and furniture to the balcony to allow flooring contractor to work.
|