1542 TULANE AVE.:

  • General contractor continued demolition in the 3rd floor annex.
  • General contractor continued wall construction in the lounges on 5th, 6th and 7th floors.
  • Painting contractor continued painting stairwell and hallway ceilings.
  • Security contractor installed the new cameras in the Lakeside Lot.
  • Facility Services continued installing new fan coil units, painting in rooms on the 6th floor, and painting the University Police office on 1st floor. Electronics technicians wired the parking gate controller for the parking garage. Plumbers continued mechanical rough-in for the kitchenettes in the 6th floor lounge.

DENTAL CAMPUS ROOFING REPAIRS:

  • Roofing Contractor continues to work on roof decking of the elevator penthouse.

DENTAL CAMPUS AUDITORIUMS A & B RENOVATIONS:

  • General Contractor continues to construct the framing for the ceiling in Auditorium A.

DENTAL CAMPUS 6TH AND 8TH FLOOR RENOVATIONS:

  • Mechanical Contractor is installing pipe hangers and vacuum piping for room 8405.

LANDSCAPING & EXTERIOR WORK:

  • Installation of landscape irrigation piping continued at 1542 Tulane.

LIBRARY COMMONS:

  • Contractor continues to frame walls.

LIONS BUILDING MITIGATION:

  • Mechanical subcontractor is running lines for new Med Gas on the 6th floor simulation rooms; running supply duct on Bolivar/Gravier side of 6th floor; insulating supply duct on CSRB side of 6th floor; re-routing waste lines in the way of the duct work on Gravier side of 6th floor; installing the vent line and the water lines to the water closets and the urinals on the 6th floor Bolivar/CSRB side bathroom; and piping in the AHU in mechanical room on 1st floor on the Gravier/Bolivar side of the building.
  • Electrical subcontractor is re-routing conduit in the way of the duct installation on the Gravier side of the 6th floor and installing lights on the 7th floor.
  • Iron subcontractor was welding the new stair structure on the 2nd floor.
  • Contractor is sealing penetrations on 7th floor; installing ceiling wire on 7th floor; hanging door frames on the CSRB side of 6th floor; and framing the bathroom on the 6th floor Bolivar / CSRB side.

MDL-5 LAB RENOVATION:

  • Contractors are installing electrical work, plumbing, casework, and partitions.

MEB 2ND FLOOR LOBBY RENOVATION:

  • Contractors are installing electrical work, plumbing, casework, and partitions.

RESIDENCE HALL LOBBY EXPANSION:

  • Botel began installing telecommunications wiring.

RESIDENCE HALL WALKWAY RESURFACING:

  • Contractor applied the first of three underlayment layers of concrete..