The painting contractor continued painting restrooms on all floors.
The electrical contractor continued installing new light fixtures in offices on the 5th and 6th Floors.
The flooring contractor installed carpet in offices on the 6th and 7th Floors.
The furniture vendor arranged offices along the front hallway on the 6th Floor and on the 7th Floor in their final layout.
The terrazzo contractor continues honing floors on the 1st Floor by the Shipping and Receiving area.
LSUHSC Facility Services continued making piping connections for the landscape irrigation.
DENTAL
CAMPUS AUDITORIUMS A & B RENOVATIONS:
The general contractor began constructing new block walls that will separate the Auditoriums.
Crews began framing new walls with studs and hat channel in both Auditoriums.
DENTAL
CAMPUS 6th & 8th FLOOR LAB RENOVATIONS:
The mechanical subcontractor is installing pipe hangers and supports for the vent piping.
DENTAL
CAMPUS ROOF REPLACEMENT:
The contractor continues installing cap sheets over roofing sheets marred by foot traffic.
LANDSCAPING
AND EXTERIOR WORK:
The installation and testing of the new trash compactor at Dental School has been completed.
LIBRARY
COMMONS:
The contractor continues to install sheetrock.
LIONS/LSU
CLINIC PERMANENT REPAIRS AND MITIGATION:
The mechanical subcontractor is insulating the supply and return ducts by the simulation rooms on the 6th Floor.
Crews are checking the connections for the VAV boxes on the 6th Floor.
They are installing piping outside of the elevator lobby to connect to the sump pump that will be installed in the pit of the freight elevator on the 1st Floor.
The iron subcontractor is setting the stairs and rails on the 5th and 6th Floors.
They are welding the saddles on the 1st Floor and welding the frame on the 4th Floor.
They are also laying the deck for the landings on the 4th and 5th Floors.
The sprinkler subcontractor is moving sprinkler heads on the 6th Floor on the CSRB side of the building.
The contractor is sealing wall penetrations on the S. Prieur St. side of the 6th Floor.
A crew is hanging sheetrock on the 6th Floor by the bathroom on the Bolivar St. side.
Door frames continue to be installed on the 6th Floor on the CSRB side.
They are cleaning the elevator pit for Elevators 2 and 3.
They continue to install the CMU walls on the 1st Floor in the bathrooms on the S. Prieur St. side of the building.
MEB MDL-5
LAB RENOVATIONS:
The audio and visual cables for the LCD monitor have been run to the control boxes.
The network wiring contractor began to terminate data cables in the main MDL room.
The contractor continues general cleaning in the main MDL room.
MEB
2nd FLOOR LOBBY RENOVATIONS:
The contractor skim-coated the honeycomb ceilings outside the lecture hall on the Bolivar St. side and framed the area at the rear of Medical Center Stores.
MEB
4th FLOOR CEILING REPLACEMENT:
The contractor installed smoke detectors and sanded sheetrock on the recessed ceiling.
RESIDENCE
HALL LOBBY EXPANSION:
The contractor completed installation of scupper roof drains on the lobby expansion deck.
The flooring subcontractor is trimming the existing brick pavers for smooth transition to new porcelain base.