The general contractor continued making drywall repairs in offices on the 5th Floor and started work in the auditorium.
The electrical contractor completed installation of new light fixtures in the lounge on the 6th Floor.
The electrical contractor continued installing new light fixtures in the 5th, 6th and 7th Floor conference rooms and started installation of new recessed lighting on the front porch.
The construction cleaning contractor completed cleaning on the 6th Floor and is re-cleaning those rooms that failed inspection.
Cleaning continues on the 5th Floor.
LSUHSC Facility Services continued making minor repairs on the 5th and 6th Floors and started punch list work on the 4th Floor.
DENTAL
CAMPUS AUDITORIUMS A & B RENOVATIONS:
The contractor floated the sheetrock in Auditorium A.
Crews installed wood blocking for the handrails and baseboard in Auditorium B and installed framing for the ceiling in Auditorium B.
The electrical subcontractor installed conduit for the lighting homeruns in Auditorium A and mounted the electrical panel in Auditorium B.
DENTAL
CAMPUS 6th & 8th FLOOR LAB RENOVATIONS:
The electrical subcontractor installed conduit, receptacle boxes, and wiring for the light switches in all the rooms of Suite 8405
They installed conduit for the peninsulas in Room 8405.
EXTERIOR/LANDSCAPING:
LSUHSC Facility Services performed grounds maintenance in preparation for the Fallfest.
LIBRARY
COMMONS:
The contractor installed fire sprinklers in the mechanical room and installed ceiling support wires in the cafe.
LIONS/LSU
CLINIC PERMANENT REPAIRS AND MITIGATION:
The mechanical subcontractor installed air outlets to two locations for air tables in the 7th Floor lab.
They insulated supply duct on the Gravier St./S. Prieur St. side of the 6th Floor.
A crew worked to install supply duct for three zones for the 1st Floor AHU located in the mechanical room.
Domestic water lines are being run in the bathrooms on the 1st Floor, Bolivar St. side.
The iron subcontractor welded the hand rails on the 1st through the 6th Floors stairs.
The electrical subcontractor installed outlets in four runs of wire mold and installed can lights on the 6th Floor.
The sprinkler subcontractor installed new sprinkler heads on the 6th Floor, CSRB side.
The contractor installed ceiling tiles on the 6th Floor CSRB side.
They installed door frames on the 6th Floor in the simulation rooms.
A crew installed corner bead and sheetrock on the 6th Floor on the Gravier St./S. Prieur St. side of the building.
Water membrane was installed on the floor of the bathroom on the 6th Floor, S. Prieur St. side.
Crews installed CMU on the 1st Floor bathroom on the S. Prieur St. side and installed metal lathe on the 1st Floor, CSRB side.
MEB
2nd FLOOR LOBBY RENOVATIONS:
The contractor installed storefront window framing.
RESIDENCE
HALL LOBBY EXPANSION:
The contractor installed sheetrock on the metal framing for the mailboxes.