  • The general contractor continued installing ceiling tiles on the 4th Floor.

 

DENTAL CAMPUS AUDITORIUMS A & B RENOVATIONS:

  • The flooring contractor prepped the sub-floor in Auditorium B for carpet.

 

DENTAL 6th & 8th FLOOR LABORATORY RENOVATIONS:

  • The general contractor installed additional sheetrock and insulation in Room 8405.

 

EXTERIOR/LANDSCAPING:

  • The contractor placed formwork and welded wire fabric in preparation for pouring the sidewalk concrete at the corner of Gravier St. and S. Claiborne Ave.

 

LIONS/LSU CLINIC PERMANENT REPAIRS AND MITIGATION:

  • The mechanical subcontractor installed supply duct on the Gravier St./Bolivar St. side of the 6th Floor.
    • A crew set fixtures in the restrooms on the 1st Floor, S. Prieur St. side.
  • The electrical subcontractor installed the last of the ground feeders to the switchgear on the 2nd Floor.
    • They continued installing cable tray on the CSRB side of the 2nd Floor.
    • Conduit was run to the fire pump controller on the 2nd Floor.
  • The sprinkler subcontractor ran pipe to the new fire pump on the 2nd Floor.
  • The contractor installed grating on the roof platform, installed door frames on the 6th Floor (Gravier/Bolivar side) and painted the walls of the mechanical room on the 2nd Floor.

 

LIBRARY COMMONS:       

  • The contractor began installing the ceiling frame above the coffee kiosk.
  • The contractor continued installing custom wood column covers. 

 

MEB PHARMACOLOGY LAB RENOVATIONS:

  • The contractor finished removing all sheetrock on interior walls of the main lab.    

 

MEB 2ND FLOOR LOBBY

  • The contractor installed sprinkler branch piping on the Bolivar St. side of the lobby.

 

MEB MDL 6 RENOVATIONS:

  • The contractor removed a portion of a block wall for the future partition storage and continued installing sheetrock above the room divider.

 

RESIDENCE HALL LOBBY EXPANSION:

  • The contractor placed two concrete curbs where two doors were removed between the A & B towers.
  • The contractor installed additional rubber glazing for the expanded storefront system on the Perdido St. side in preparation for glass installation.