The general contractor continued installing ceiling tiles on the 4th Floor.
Facility Services continued installing new locksets on the 4th Floor doors.
DENTAL CAMPUS AUDITORIUMS A & B RENOVATIONS:
The flooring contractor installed additional patch for the sub-floor in Auditorium B and began grinding the sub-floor to a level finish in Auditorium A.
The general contractor installed the door frame for the new A/V room (4202).
DENTAL 6th & 8th FLOOR LABORATORY
RENOVATIONS:
The general contractor installed door frames for Rooms 8405F and 8405H, and installed the window frame for Room 8405J.
EXTERIOR/LANDSCAPING:
The contractor poured new concrete sidewalks in the lot at the corner of Gravier St. and S. Claiborne Ave.
Facility Services painted new motorcycle/bicycle parking area on the 1st deck of the Roman St Garage.
LIONS/LSU CLINIC PERMANENT REPAIRS AND MITIGATION:
The mechanical subcontractor installed supply grilles on the 6th Floor, Gravier St./S. Prieur side.
They set the AHU on the Bolivar St. Side of the 6th Floor Bolivar and set fixtures in the restrooms on the 1st Floor. S. Prieur St.side.
The electrical subcontractor cleaned and megged the switchgear and installed light fixtures and receptacle covers on the 2nd Floor.
The fireproofing subcontractor painted the interior beams of the new stairwell on Floors 1 through 3.
The sprinkler subcontractor continued installing pipe to the fire pump on the 2nd Floor.
The contractor painted the mechanical room on the 2nd Floor.
LIBRARY COMMONS:
The contractor continued installing the ceiling frame above the coffee kiosk.
MEB PHARMACOLOGY LAB RENOVATIONS:
The contractor finished removing casework from Room 5220 and removed the metal studs separating Rooms 5220 and 5221.
MEB 2ND FLOOR LOBBY RENOVATIONS:
The contractor installed additional sprinkler branch piping on the Bolivar St. side of the lobby.
The contractor secured the window frames on the Bolivar St. side.
MEB MDL 6 RENOVATIONS:
The contractor installed sheetrock above the steel track in the main MDL room.
RESIDENCE HALL LOBBY EXPANSION:
The contractor installed additional rubber glazing for the expanded storefront system on Perdido St. side.
The contractor installed conduits on top of the Residence Hall walkway.