Louisiana State University Health Sciences Center Administration & Finance
 

Thursday, December 04, 2008

 

1542 TULANE AVE.:

  • The electrical contractor continued installing new light fixtures in the conference rooms on the 2nd and 3rd Floors.
  • The elevator contractor continued removing the protective film on Elevator 3.  
  • The general contractor continued drywall priming and painting in Room 545.
  • The painting contractor continued painting the front stairwell on the Charity end of the hall.
  • The network wiring contractor continued wiring new drops on the 5th Floor.
  • LSUHSC Facility Services continued making minor repairs on various floors.
  • LSUHSC electricians continued running new conduit for additional exterior lighting in the rear of the building.

 

DENTAL CAMPUS AUDITORIUM A & B RENOVATIONS:

  • The mechanical contractor completed the drain lines to both AHUs and installed registers in Auditorium A. 
  • The contractor installed the CMU wall for the electrical room.  

 

DENTAL 6th & 8th FLOOR LABORATORY RENOVATIONS:

  • The general contractor applied mastic to the exterior wall in Room 6335. 

 

LIONS/LSU CLINIC PERMANENT REPAIRS AND MITIGATION:

  • The mechanical subcontractor installed new acid waste lines in the 6th Floor ceiling for the 7th Floor lab.
    • They installed additional thermostats on the 6th Floor. 
    • A crew demolished ductwork and storm drains in the 6th Floor lab.
  • The electrical subcontractor demolished conduits in the 6th Floor lab and demolished Panels HA6A and LA6A on the 6th Floor.
    • They cleaned the buss duct for the 2nd Floor switchgear and tested the line side of the new switchgear in preparation for the Entergy feed.
    • They also installed conduit for switches and receptacles on the CSRB side of the 2nd Floor.
  • The sprinkler subcontractor installed stand pipe for the new stairwell sprinklers.
  • The contractor applied wall patch to the sheetrock on the 6th Floor, CSRB side.
    • Crews continued installing metal studs and sheetrock for the fur down on the 6th Floor and metal studs and sheetrock on the 2nd Floor.
    • They are plastering the 1st Floor CMU wall, installing wall tile in the 1st Floor restrooms and CMU on the CSRB side of the 1st Floor.   

 

LIBRARY COMMONS:              

  • The contractor installed floor tile in half of the elevator lobby and grouted the floor tile in the café area.

 

MEB 2ND FLOOR LOBBY RENOVATIONS:

  • The sprinkler subcontractor installed sprinkler pipe on the Allied Health/Nursing side of the lobby.

 

MEB MDL 6 RENOVATIONS:

  • The contractor removed the old blackboards from the main MDL room.

 

RESIDENCE HALL LOBBY EXPANSION:

  • The contractor installed the horizontal frame at the double sliding door for the external enclosure.
  • The contractor created new supply holes on existing duct for slot diffusers between Tower A and B.
  • The contractor continued the electrical rough in (running conduits and junction boxes for light fixtures) between Tower A and B.