The general contractor completed installing the ceiling grid in Room 443.
Their crews started drywall installation in the 2nd Floor lounge and completed framing new walls in the 1st Floor lounge.
The painting contractor completed painting the shipping and receiving dock area.
Facility Services continued painting offices and hallways on the 4th Floor and continued installing new door hardware on the 3rd Floor.
DENTAL
CAMPUS AUDITORIUMS A & B RENOVATIONS:
The contractor insulated AHU ductwork for Auditorium A.
DENTAL
6th & 8th FLOOR RENOVATIONS:
The paint contractor painted the second coat of primer on the new walls on the 8th Floor.
The sprinkler contractor replaced sprinkler heads in Rooms 6333 and 6335.
EXTERIOR/LANDSCAPING:
Facility Services continued installing irrigation sprinklers and grading the planting beds in the back of the Resource Center .
LIONS/LSU
CLINIC PERMANENT REPAIRS AND MITIGATION:
The electrical subcontractor installed conduit and junction boxes on Floors 1 through 4 for the generator electrical lines on the Bolivar Street side chase.
They began installing wire and junction boxes for the fire alarm devices on the 6th Floor, S. Prieur Street side.
Electricians began installing exit fixtures on the 6th Floor, S. Prieur Street side and continued to run conduit on the 6th Floor, Bolivar Street side.
The mechanical subcontractor continued installing control wire to the VAVs in the middle of the 6th Floor.
They tested the heating hot water lines and insulated heating hot water lines and supply duct on the 6th Floor, Bolivar Street side.
The sprinkler subcontractor installed sprinkler heads on the 6th Floor, CSRB/S. Prieur Street side.
The contractor installed wall tile on the 1st Floor, Gravier/Bolivar Street side.
LIBRARY
COMMONS:
The contractors installed fire alarm wiring near the window walls; continued taping and floating walls; and installed the menu board for the coffee kiosk.
MEB
2ND FLOOR LOBBY RENOVATIONS:
The contractor installed sheetrock on the Bolivar Street side.
MEB
MDL 6 RENOVATIONS:
The contractors continued relocating sprinkler heads in the main MDL room and patched and floated the walls in the panel storage room.
MEB
PHARMACOLOGY LAB RENOVATIONS:
The electrical contractor ran conduit in the laboratory area.
The mechanical contractor continued to cap hot/cold/deionized water lines on the 4th Floor below the Pharmacology labs.
RESIDENCE
HALL LOBBY EXPANSION:
The contractors removed existing glass from the old storefront system.
Crews installed sheetrock on the mezzanine level soffit and installed ceiling grid hanger wire between the A and B Towers.