The general contractor installed carpet and cove base in Room 443.
They continued drywall installation in the 2nd Floor lounge and framing new walls in the 1st Floor lounge.
The mechanical contractor removed old fan coil units and installed new units in Rooms 419 and 453.
Facility Services continued painting offices and hallways on the 4th Floor, installing new door hardware on the 3rd Floor.
They continued completing minor repairs on the 1st and 4th Floors.
DENTAL
CAMPUS AUDITORIUMS A & B RENOVATIONS:
The mechanical contractor insulated the Auditorium B air handling unit.
DENTAL
6th & 8th FLOOR RENOVATIONS:
The paint contractor applied the 2nd coat of paint on all walls on the 8th Floor and primed the walls on the 6th Floor.
The sprinkler contractor replaced the sprinkler heads in Rooms 8405B through 8405K.
The general contractor installed the ceiling grid in Rooms 8405J and 8405H and installed the wall angle in Room 8405A.
EXTERIOR/LANDSCAPING:
The contractor installed fence posts in the lot at the corner of Gravier St and S Claiborne Ave.
Facility Services commenced planting shrubs in the back of the Resource Center Building .
LIONS/LSU
CLINIC PERMANENT REPAIRS AND MITIGATION:
The electrical subcontractor installed conduit and junction boxes on the 5th and 6th Floors for the generator electrical lines on the Bolivar St. side chase.
They continued installing wire and junction boxes for the fire alarm devices and installing exit fixtures on the S. Prieur St side of the 6th Floor.
The mechanical subcontractor set sinks on the 6th Floor, S. Prieur St. side restrooms.
They installed supply duct and insulated heating hot water lines and supply duct on the 6th Floor, Bolivar St. side.
The contractor installed wall tile on the 1st Floor, Gravier/Bolivar St. side.
They installed countertops in the 6th Floor Bolivar and S. Prieur St. side restrooms.
They installed restroom partitions in the 6th Floor bathrooms on the Bolivar S. side.
Crews removed ceiling grid and started installing a temporary plastic barrier in Rooms 901, 908, and 910.
Others applied the finishing paint coat to the 5th and 6th Floors of the new stairwell.
LIBRARY
COMMONS:
The contractor installed the door frame for the main entrance.
They painted doorframes and continue to tape and finish the walls and ceiling at the elevator lobby.
MEB
2ND FLOOR LOBBY RENOVATIONS:
The contractor taped and floated sheetrock on the Bolivar Street side of the lobby.
MEB
MDL 6 RENOVATIONS:
The contractors continued patching and floating the walls and installed ceiling tiles in the main MDL room.
MEB
PHARMACOLOGY LAB RENOVATIONS:
The electrical contractor ran conduit in the laboratory area.
The mechanical contractor capped natural gas lines in the laboratory and administrative areas.
RESIDENCE
HALL LOBBY EXPANSION:
The contractors completed removing existing frames from the old storefront system.
They completed installing sheetrock for the soffit in the corner of S. Roman and Perdido lobby.
A crew continued to clean the exterior side of the new glass on the Perdido St. side.