1542 TULANE AVE. :

  • The general contractor completed installing new sprinkler piping in the 2nd Floor lounge.
    • They continued patching holes in offices on the 2nd and 3rd floors.
  • The mechanical contractor continued piping new fan coil units on the 2nd and 3rd Floors.
  • LSUHSC Facility Services continued painting offices and hallways on the 4th Floor and continued pressure washing the Lakeside Lot.

 

DENTAL 6th & 8th FLOOR RENOVATIONS:

  • The flooring contractor installed the terrazzo floor patches in Rooms 8405A, 8405B, 8405C, 8405F, 8405G, 8405H, and 8405I. 
  • The general contractor installed doors in Rooms 8405A, 8405B, 8405C, 8405E, 8405F, and 8405K.

 

EXTERIOR/LANDSCAPING:

  • LSUHSC Facility Services completed installation of irrigation piping behind the Resource Center at the corner of S. Prieur and Gravier Streets.

 

LIONS/LSU CLINIC PERMANENT REPAIRS AND MITIGATION:        

  • The contractor continued installing 6th Floor curtain wall mullions on the exterior stairwell.
  • The mechanical subcontractor insulated chill water supply and return lines on the 1st Floor, Bolivar Street side.
    • They continued installing fire dampers on the 2nd Floor.
  • The contractor installed wall angles on the 1st Floor, taped and floated the elevator lobby on the 1st Floor and cleaned the granite wall on the 1st Floor. 
  • The electrical contractor installed conduit in Rooms 908 and 910.
    • They tested all the receptacles on the 6th Floor and roughed in lights in the old lab area. 

 

LIBRARY COMMONS:

  • The contractor touched up conduit in the black ceiling area.
    • They began prepping the concrete subfloor for the carpet installation. 
  • LSUHSC plumbers connected the large kitchen sink for the coffee kiosk.

 

MEB MDL 6 RENOVATIONS:

  • The contractor began installing the casework frame in the main MDL lab.
  • They installed marker boards and replaced existing receptacle outlets with new ones.

 

MEB PHARMACOLOGY LAB RENOVATIONS:

  • The general contractor continued hanging sheetrock in the administrative area and taping and floating the lab area. 
  • The electrical contractor continued pulling wire in the administrative area. 

 

RESIDENCE HALL LOBBY EXPANSION: 

  • The interior contractor continued installing ceiling grid in the corner lobby of S. Roman St./Perdido St. and Bolivar St./Perdido St.  
  • The enclosure contractor installed the door frame on the walkway leading to the Residence Hall Lobby.

 

ALLIED HEALTH/NURSING ROOF REPLACEMENT:

  • The concrete was poured for the base of the temporary elevator lift that will be used to transport materials and workers to the roof during the project.