The general contractor completed installing new sprinkler piping in the 2nd Floor lounge.
They continued patching holes in offices on the 2nd and 3rd floors.
The mechanical contractor continued piping new fan coil units on the 2nd and 3rd Floors.
LSUHSC Facility Services continued painting offices and hallways on the 4th Floor and continued pressure washing the Lakeside Lot.
DENTAL
6th & 8th FLOOR RENOVATIONS:
The flooring contractor installed the terrazzo floor patches in Rooms 8405A, 8405B, 8405C, 8405F, 8405G, 8405H, and 8405I.
The general contractor installed doors in Rooms 8405A, 8405B, 8405C, 8405E, 8405F, and 8405K.
EXTERIOR/LANDSCAPING:
LSUHSC Facility Services completed installation of irrigation piping behind the Resource Center at the corner of S. Prieur and Gravier Streets.
LIONS/LSU
CLINIC PERMANENT REPAIRS AND MITIGATION:
The contractor continued installing 6th Floor curtain wall mullions on the exterior stairwell.
The mechanical subcontractor insulated chill water supply and return lines on the 1st Floor, Bolivar Street side.
They continued installing fire dampers on the 2nd Floor.
The contractor installed wall angles on the 1st Floor, taped and floated the elevator lobby on the 1st Floor and cleaned the granite wall on the 1st Floor.
The electrical contractor installed conduit in Rooms 908 and 910.
They tested all the receptacles on the 6th Floor and roughed in lights in the old lab area.
LIBRARY
COMMONS:
The contractor touched up conduit in the black ceiling area.
They began prepping the concrete subfloor for the carpet installation.
LSUHSC plumbers connected the large kitchen sink for the coffee kiosk.
MEB
MDL 6 RENOVATIONS:
The contractor began installing the casework frame in the main MDL lab.
They installed marker boards and replaced existing receptacle outlets with new ones.
MEB
PHARMACOLOGY LAB RENOVATIONS:
The general contractor continued hanging sheetrock in the administrative area and taping and floating the lab area.
The electrical contractor continued pulling wire in the administrative area.
RESIDENCE
HALL LOBBY EXPANSION:
The interior contractor continued installing ceiling grid in the corner lobby of S. Roman St./Perdido St. and Bolivar St./Perdido St.
The enclosure contractor installed the door frame on the walkway leading to the Residence Hall Lobby.
ALLIED
HEALTH/NURSING ROOF REPLACEMENT:
The concrete was poured for the base of the temporary elevator lift that will be used to transport materials and workers to the roof during the project.