The general contractor continued taping and floating the drywall in the 2nd Floor lounge and framing walls and fur downs in the 1st Floor lounge.
The mechanical contractor continued piping new fan coil units on the 2nd and 3rd Floors.
The network wiring contractor continued installation of new network drops on the 4th Floor.
The painting contractor continued painting exterior and stairwell doors.
Facility Services continued painting offices and hallways on the 4th Floor and continued installing the new electrical conduit for exterior lighting by the Shipping and Receiving entrance.
DENTAL
6th & 8th FLOOR RENOVATIONS:
The contractor installed the remaining corner guards in Rooms 8405A - 8405K.
LIONS/LSU
CLINIC PERMANENT REPAIRS AND MITIGATION:
The electrical subcontractor switched the power service for panel HDRB to the new switchgear.
The sprinkler subcontractor continued running distribution lines to the new stairwell and at the new fire pump.
The mechanical subcontractor insulated pipes in the 6th Floor AHU room and installed fire dampers on the 2nd Floor.
The contractor continued hanging sheetrock and running electrical conduits in the old 6th Floor lab area.
LIBRARY
COMMONS:
The contractor installed storefront at the stairs.
MEB
MDL 6 RENOVATIONS:
The contractor completed patching and leveling the concrete subfloor floor in the lab.
MEB
PHARMACOLOGY LAB RENOVATIONS:
The general contractor continued to install sheetrock and insulation in the laboratory area; and began taping and floating sheetrock in the laboratory area.
The electrical contractor installed additional conduit in the administration area.
The mechanical contractor installed waste water pipes below the laboratory area.
MEB
2nd FLOOR LOBBY RENOVATIONS:
The contractor installed ceiling grid on the Bolivar Street side.
The contractor painted the exposed sprinkler pipe.
The contractor installed the interior storefront walkway door.
RESIDENCE
HALL LOBBY EXPANSION:
The interior contractor continued installing sheetrock for the fur down in the Perdido St. /Bolivar St. corner of the lobby.
They painted the fur down for the lobby between the A & B Towers .
The enclosure contractor completed removing the temporary wall.