The mechanical contractor continued piping new fan coil units on the 3rd Floor.
The painting contractor continued priming and painting offices on the 3rd Floor.
Facility Services continued repairs on the 3rd Floor, connecting electrical service for fan coil units, and installing new door hardware on the 2nd and 3rd Floors.
EXTERIOR/LANDSCAPING:
Contractor laid sod along S. Claiborne Ave. adjacent to the Gravier St. garage.
LIONS/LSU
CLINIC PERMANENT REPAIRS AND MITIGATION:
The mechanical subcontractor continued installing fuel lines in Room 901.
The contractor painted the passenger elevator lobby on the 6th Floor.
They installed laminate on the fur down on the Gravier St./Bolivar St. side of the 6th Floor.
Crews continued to clean the granite floor tile on the 1st and plaster CMU walls on the Bolivar St. side of the 1st Floor.
Others installed bathroom partitions on the 1st Floor, S. Prieur Street side.
Mullions and corners were installed on the 1st and 2nd Floors of the new stairwell.
The sprinkler contractor installed sprinklers in the passenger elevator lobby on the 6th Floor.
LIBRARY
COMMONS:
The contractor installed ceiling tiles in the study area.
A crew patched and painted the fur down above the coffee kiosk.
The contractor continued floating the composite wall panels.
MEB
MDL 6 RENOVATIONS:
The AV contractor installed LCDs.
MEB
PHARMACOLOGY LAB RENOVATIONS:
The contractor installed three doorframes in the administration area.
The contractor demolished a portion of the exterior corridor wall in order to install a doorframe in the lab area.
They continued to paint the lab area.
RESIDENCE
HALL LOBBY EXPANSION:
The interior contractor continued installing grid in the back lobby area.
The enclosure contractor installed additional break metal to cover the roof drain pipes on both sides of the walkway.
DENTAL
6th & 8th FLOOR RENOVATIONS:
The contractor placed structural components of the laboratory casework in Room 8405A.
DENTAL
AUDITORIUMS A & B RENOVATIONS:
The contractor continued demolishing the wing walls in Auditoriums A and B.
ALLIED
HEALTH/NURSING ROOF REPLACEMENT:
The contractor completed installation of the temporary exterior elevator.