1542 TULANE AVE.:

  • The general contractor continued patching, priming and painting offices on the 3rd Floor. 
  • The parking garage contractor began bead blasting the existing pavement striping in the parking garage and removing the old wheel stops. 
  • The painting contractor continued priming and painting offices on the 3rd Floor. 
  • Facility Services continued making repairs on the 1st and 3rd Floors, painting hallways on the 3rd Floor, connecting electrical service for fan coil units, and installing new door hardware on the 2nd Floor.

 

LIONS/LSU CLINIC PERMANENT REPAIRS AND MITIGATION:

  • The contractor continued installing laminate on the fur down on the Gravier St./Bolivar St. side of the 6th Floor.
    • They continued to prime the walls on the 6th Floor, Gravier Street side.
    • Plywood for the parapet wall was hung on the stair tower roof.
    • Crews continue installing mullions and corners on the 1st through 6th Floors of the new exterior stairwell.
  • The electrical contractor installed pipe for the battery charger and water heater serving the generator engine on the roof.
    • They installed wire for light fixtures on the 6th Floor in the computer lounge area on the Gravier Street side.

 

LIBRARY COMMONS:

  • LSUHSC electricians installed light fixtures along the window wall. 

 

MEB MDL 6 RENOVATIONS:

  • The contractor hooked up the gas, vacuum, and air lines inside the casework. 

 

MEB PHARMACOLOGY LAB RENOVATIONS:

  • The contractor plumbed in water, vacuum, and gas lines underneath the administrative area.

 

RESIDENCE HALL LOBBY EXPANSION:

  • The contractor poured the lobby floor concrete. 

 

DENTAL 6th & 8th FLOOR RENOVATIONS:

  • The contractor fire-caulked the flooring and wall penetrations in Suite 8405 .

 

DENTAL AUDITORIUMS A & B RENOVATIONS:

  • The contractor continued demolishing the wing walls in Auditoriums A and B.