The electrical contractor continued the electrical rough-in in the 1st Floor lounge.
The glass contractor continued trim work on the new storefront in the 1st Floor lounge.
The mechanical contractor continued installing new fan coil units on the 3rd Floor.
The painting contractor continued patching offices on the 2nd Floor.
LSUHSC Facility Services continued making repairs on the 1st and 3rd Floors and connecting electrical service for fan coil units on the 3rd Floor.
LIONS/LSU
CLINIC PERMANENT REPAIRS AND MITIGATION:
The contractor continued prepping the freight elevator for new flood proofing.
They continued installing cabinets for the reception desk on the 6th Floor and began installing the wood for the reception desk countertop.
Crews continued installing exterior granite on the new stairwell, caulking the glass on the stairwell, installing sheet vinyl in the simulation labs and installing VCT in the CSRB side hallway.
The contractor began applying the color enhancer to the granite walls on the 1st Floor, Gravier Street side.
The mechanical contractor piped in the medical air/gas/vacuum ceiling boxes in the 6th Floor simulation rooms and continued installing supply and return grilles in the 6th Floor computer lounge.
The sprinkler subcontractor continued installing sprinkler heads in the 6th floor computer lounge.
LIBRARY
COMMONS:
The contractor installed supports for the acoustical ceiling baffles.
Workers installed base molding in the study area and in the elevator lobby.
LSUHSC Facility Services continued installing the drains for the coffee kiosk.
MEB
2nd FLOOR LOBBY RENOVATIONS:
The contractor continued installing light fixtures throughout the lobby area.
LSUHSC employees began labeling wire that needs to be re-routed in the open ceiling.
MEB
PHARMACOLOGY LAB RENOVATIONS:
The contractor continued installing ceiling grid in the administrative area and exhaust ductwork in the corridor.
The contractor modified sprinkler heads in the lab area.
RESIDENCE
HALL LOBBY EXPANSION:
The contractor continued framing the fur down in back lobby area in Tower A.
The contractor installed pendant light fixtures in the back lobby area in Tower C.
They continued running fire alarm wires between the A & B tower lobby areas.
The enclosure contractor installed glass for both sliding doors.
DENTAL
6th & 8th FLOOR LAB RENOVATIONS:
The cabinet installers installed the remaining counter tops for the peninsulas in Suite 8405A and 8405B.
The network wiring crew installed the network wiring in Rooms 8405H, 8405I, and 8405J.
The plumbing contractor installed sink connections (hot water, cold water, and drain) for the sinks in Rooms 8405F and 8405G.
DENTAL
BOILER INSTALLATION:
The contractor installed relief valves for the new boiler.