Louisiana State University Health Sciences Center Administration & Finance
 

Friday, March 13, 2009

 

1542 TULANE

  • The electrical contractor continued the electrical rough-in in the 1st Floor lounge.
  • The glass contractor continued trim work on the new storefront in the 1st Floor lounge.
  • The mechanical contractor continued installing new fan coil units on the 3rd Floor.
  • The painting contractor continued patching offices on the 2nd Floor.
  • LSUHSC Facility Services continued making repairs on the 1st and 3rd Floors and connecting electrical service for fan coil units on the 3rd Floor.

 

LIONS/LSU CLINIC PERMANENT REPAIRS AND MITIGATION:    

  • The contractor continued prepping the freight elevator for new flood proofing.
    • They continued installing cabinets for the reception desk on the 6th Floor and began installing the wood for the reception desk countertop.
    • Crews continued installing exterior granite on the new stairwell, caulking the glass on the stairwell, installing sheet vinyl in the simulation labs and installing VCT in the CSRB side hallway.
    • The contractor began applying the color enhancer to the granite walls on the 1st Floor, Gravier Street side.
  • The mechanical contractor piped in the medical air/gas/vacuum ceiling boxes in the 6th Floor simulation rooms and continued installing supply and return grilles in the 6th Floor computer lounge.
  • The sprinkler subcontractor continued installing sprinkler heads in the 6th floor computer lounge.

 

LIBRARY COMMONS:

  • The contractor installed supports for the acoustical ceiling baffles.
  • Workers installed base molding in the study area and in the elevator lobby.
  • LSUHSC Facility Services continued installing the drains for the coffee kiosk.

 

MEB 2nd FLOOR LOBBY RENOVATIONS:

  • The contractor continued installing light fixtures throughout the lobby area.
  • LSUHSC employees began labeling wire that needs to be re-routed in the open ceiling.

 

MEB PHARMACOLOGY LAB RENOVATIONS:

  • The contractor continued installing ceiling grid in the administrative area and exhaust ductwork in the corridor. 
  • The contractor modified sprinkler heads in the lab area.

 

RESIDENCE HALL LOBBY EXPANSION: 

  • The contractor continued framing the fur down in back lobby area in Tower A.
  • The contractor installed pendant light fixtures in the back lobby area in Tower C.
  • They continued running fire alarm wires between the A & B tower lobby areas.
  • The enclosure contractor installed glass for both sliding doors.

 

DENTAL 6th & 8th FLOOR LAB RENOVATIONS:

  • The cabinet installers installed the remaining counter tops for the peninsulas in Suite 8405A and 8405B.
  • The network wiring crew installed the network wiring in Rooms 8405H, 8405I, and 8405J. 
  • The plumbing contractor installed sink connections (hot water, cold water, and drain) for the sinks in Rooms 8405F and 8405G.

 

DENTAL BOILER INSTALLATION:

  • The contractor installed relief valves for the new boiler.