The general contractor continued painting in Room 109H and continued drywall and ceiling work in Rooms 111 and 111A.
The electrical contractor continued electrical rough-in in the 1st Floor lounge.
The painting contractor continued painting offices on the 2nd Floor.
Facility Services continued repairs on the 1st Floor and installing thermostats for fan coil units on the 3rd Floor.
LIONS/LSU CLINIC PERMANENT REPAIRS AND MITIGATION:
The contractor load tested the roof top generator.
The contractor continued placing concrete forms for the freight elevator floodproofing wall.
Crews continued installing exterior granite on the 2nd level of the new stairwell.
They continued installing carpet in the large conference room, floor tile in the elevator lobby on the 6th Floor and VCT flooring in the hallways between the simulation rooms.
The contractor began installing fire rated wall on the 5th Floor for the new stairwell.
The mechanical contractor tied in the medical air/gas/vacuum to the Stryker equipment in the simulation rooms and installed the building management system in the 6th Floor Bolivar Street side mechanical room.
The electrical contractor installed lights in the computer lounge and above the receptionist desk.
LIBRARY COMMONS:
The contractor completed installing the new ceiling baffles.
The contractor began installing the magazine rack in the study area.
MEB 2nd FLOOR LOBBY RENOVATIONS:
The contractor continued installing light fixtures.
MEB PHARMACOLOGY LAB RENOVATIONS:
The contractor modified sprinkler heads in the lab area.
The flooring contractor leveled the floor.
RESIDENCE HALL LOBBY EXPANSION:
The contractor taped and floated the fur down in back lobby area of Tower A.
The contractor began relocating sprinkler heads.
DENTAL 6th & 8th FLOOR LAB RENOVATIONS:
The network wiring crew installed the wiring in Rooms 8405H, 8405I, and 8405J.
The electrical contractor installed receptacles for the peninsulas in 8405A and 8405B.
ALLIED HEALTH/NURSING ROOF REPLACEMENT:
The contractor removed the lightweight concrete roofing system from the elevator penthouse and began installing foam insulation.