Facilities personnel demolished fan coil units and associated piping in Rooms 109H, 110, 111, 341, 342 and 343.
LIONS/LSU
CLINIC PERMANENT REPAIRS AND MITIGATION:
The contractor installed carpet on the CSRB side of the 6th Floor.
Crews installed ceiling wires and grid on the 6th Floor in the computer lounge area.
They continued installing the wall around the new roll up fire door on the 6th Floor.
Exterior glass continues to be installed on the exterior of the new stairwell.
The mechanical contractor roughed in the waste and water lines for the restroom on the Bolivar St. side of the 1st Floor,
They tested all of the diesel fuel lines that run from the roof to the 1st Floor.
Crews continued installing fuel pipes on the CSRB side of the 1st Floor.
They continue installing supply and return grilles on the 6th Floor, Gravier Street side.
The sprinkler contractor continued installing sprinkler heads on the 6th Floor, Gravier Street side.
LIBRARY
COMMONS:
The contractor finished installed the new window shades.
They continue to paint the composite wall panels in the small multimedia room and install the wooden ceiling trim in the study area.
The installation of the display cases at the feature wall is proceeding.
MEB
2nd FLOOR LOBBY RENOVATIONS:
The contractor installed sheetrock around the new door frames.
MEB
PHARMACOLOGY LAB RENOVATIONS:
The contractor continued painting in the administration area.
RESIDENCE
HALL LOBBY EXPANSION:
The mechanical contractor began running sprinkler pipes in the expanded lobby area.
The flooring contractor applied primer and another layer of leveling concrete in the expanded lobby area.
DENTAL
SCHOOL A and B AUDITORIUM RENOVATIONS:
The contractor sanded and prepped the new wing walls in Auditoriums A & B for painting.
DENTAL
6th & 8th FLOOR LAB RENOVATIONS:
The contractor installed base cabinets and rolling tables for the lab furniture in Rooms 8405C, 8405D, 8405F, and 8405G.
Crews installed base cabinets and countertops in Room 6335 and installed new laminated wall panels in the corridor to close the original door opening.
DENTAL SCHOOL
BOILER INSTALLATION:
The contractor installed the electrical disconnect for new boiler and fabricated additional gas and steam piping for connecting the boiler to the building systems.
ALLIED
HEALTH/NURSING ROOF REPLACEMENT:
The contractor continues to remove the old ballast (gravel) from the roof.