  • The general contractor continues installing the ceiling grid in Rooms 341, 342 and 343.
    • Workers are finishing the drywall in the 1st Floor lounge and are priming the walls in the auditorium.
  • The ceiling grid contractor began repairing the 3rd Floor hallway ceiling grid.
  • LSUHSC Facility Services continued making electrical repairs on the 1st and 3rd Floors and painting on the 3rd floor.

 

EXTERIOR/LANDSCAPING:

  • LSUHSC Facility Services continued installing irrigation piping and sprinklers at the corner of S. Roman St. and Perdido St .

 

LIONS/LSU CLINIC PERMANENT REPAIR AND MITIGATION:   

  • The contractor framed the interior wall for the 6th Floor stairwell.
    • Workers installed additional ceiling tile on the Gravier St. side of the 6th Floor.
    • A crew installed glass on the exterior of the new stairwell.
    • Workers patched the 1st Floor in preparation for the epoxy installation.
  • The electrical contractor ran pipe from the controller to the motor for the fire pump.
    • Electricians installed lights and receptacles on the Bolivar St. side of the 1st Floor and cleaned light fixtures on the 1st floor.  

 

LIBRARY COMMONS:

  • The contractor installed sprinkler caps throughout the space. 
  • Wall paper was installed in the back office area.
  • They continue with the general clean up as the work nears completion.  

 

MDL-3 RENOVATIONS:

  • A new contract has been issued to renovate Multi-Disciplinary Lab 3 in the MEB. 
    • The renovations will replicate the renovations that have recently been completed in MDL 6 including a completely new layout, new casework, new countertops, new flooring, etc.  The audio/visual equipment will be replaced with state of the art equipment.
  • The contractor began work by demolishing the existing casework, removing acid waste lines, and disconnecting the old plumbing.

 

MEB PHARMACOLOGY LAB RENOVATIONS

  • The casework contractor installed countertops on the second side of the peninsula casework in Room 5219. 
  • The plumbing contractor continued hooking up the sinks in the administrative area. 
  • The contractor applied the final coat of paint in the department head’s office.

 

ALLIED HEALTH/NURSING BLDG RE-ROOFING PROJECT:

  • The contractor installed tapered insulation and a cap on a 40 foot section of the roof parallel to Perdido Street . 
  • The contractor removed the old flashing from around the roof.    

 

RESIDENCE HALL LOBBY EXPANSION: 

  • The interior contractor began framing the sheetrock ceiling in the expanded lobby area. 
  • The interior contractor completed installing ceiling tiles in the A and C Towers and in the area between the A & B Towers . 

 

DENTAL SCHOOL AUDITORIUMS A & B RENOVATIONS:

  • The electrical contractor installed additional conduit in the crosswalk between the Auditoriums and the rack room 4202B.
  • The A/V contractor installed speakers and wiring in Auditorium A.