MONDAY, APRIL 27, 2009

 

1542 TULANE AVE.:

  • The general contractor continued finishing drywall in the 1st Floor lounge.
    • Crews continued installing ceiling grid in the 1st Floor lounge.
    • They finished painting the auditorium.
  • The ceiling grid contractor continued repairing the 2nd Floor front hallway ceiling. 
  • The cleaning contractor continued cleaning offices on the 3rd Floor.
  • Duplicating and Printing was relocated from their temporary location in the Residence Hall to Rooms 110, 111 and 111A. 
  • Facility Services continued making electrical repairs on the 1st and 3rd Floors and painting rooms on the 2nd and 3rd Floors.

 

LIONS/LSU CLINIC PERMANENT REPAIRS AND MITIGATION:    

  • The contractor installed new sprinkler lines in the landscaping at the front of the building; replacing lines that were removed during the excavation for the new exterior stairwell.
    • They began installing the extension of the metal platform on the roof for the electrical panel.
    • Workers installed carpet on the Gravier St. side of the 6th Floor.
    • They continue installing trim for the windows of the stair tower at the 4th and 5th levels.
    • Crews are installing the shaft walls of the stairwell at the 2nd and 3rd levels.
    • The new shaft walls on the 4th through the 6th levels are being taped and floated.
    • Workers continued to waterproof the granite wall panels on the new stairwell.
  • The electrical contractor began terminating the new fiber cables in the 6th Floor network closet.
    • They ran wire for the sump pumps in the elevator pits.
    • Door closures were installed on the Bolivar St. side of the 6th Floor.

 

LIBRARY COMMONS:

  • The contractor patched the opening in the ceiling of the elevator lobby.

 

MDL-3 RENOVATIONS:

  • The contractor abated the floor in the room.

 

RESIDENCE HALL LOBBY EXPANSION:

  • The contractor completed installing ceiling grid for the sheetrock ceiling underneath the mezzanine level of the A & B Towers and in the expanded lobby area.
  • The contractor continued installing ceiling grid for the acoustical ceiling between the B & C Towers. 
  • The contractor cored holes for floor boxes between the A & B Towers .

 

MEB 2ND FLOOR LOBBY RENOVATIONS:

  • The contractor installed surface mount lights on the Bolivar Street side of the lobby.
  • They taped and floated the walls around the new doors across from the elevators.

 

MEB PHARMACOLOGY LAB RENOVATIONS:

  • The contractor continued installing receptacle raceways and light fixtures in the laboratory area.

 

ALLIED HEALTH/NURSING RE-ROOFING PROJECT:

  • The contractor removed the remaining portions of the old roof and installed the temporary cap over those areas of the roof. 
    • This phase of the work is complete on the roof of the building.
  • The contractor removed approximately three quarters of the old roof from the walkway roof and started installing insulation and the cap sheet. 

 

DENTAL SCHOOL AUDITORIUMS A & B RENOVATIONS:

  • The contractor installed sheetrock and floor tile in Room 4202B.