  • LSUHSC Computer Services, Networking Group continued checking the phone lines on the 3rd Floor. 
  • LSUHSC Facility Services is painting the 2nd Floor corridor.  
  • Facility Services carpenters continue to laminate the wooden window sills in 2nd Floor offices along Tulane Avenue .

 

LIONS/LSU CLINIC PERMANENT REPAIRS AND MITIGATION:    

  • The electrical contractor switched all building power from the old switchgear to the new switchgear; the building is now powered completely from the 2nd Floor.
  • The contractor began removing pipe and wire from the old switchgear.
  • Ceiling panels were installed in the 6th Floor computer lounge.

 

RESIDENCE HALL LOBBY EXPANSION:

  • The floor contractor installed floor tile in front of Residence Hall Managers Office. 

 

MEB AIR HANDLING UNIT REPLACEMENT:

  • The contractor installed temporary lighting in mechanical rooms 6D and 7D. 
  • LSUHSC Facility Services staged temporary air conditioning units and began the installation of temporary electrical panels to support the temporary air conditioning for 6th and 7th Floor, Quadrant D.

 

MEB MDL 3 RENOVATION:

  • The contractor continued installing sheetrock around the steel track for sound insulation.

 

MEB PHARMACOLOGY LAB RENOVATIONS:

  • The network wiring contractor continued pulling network wires in the lab area. 
  • The contractor continued installing wire mold in the large lab area. 

 

ALLIED HEALTH/NURSING BLDG RE-ROOFING PROJECT:

  • The contractor installed sheetrock in the atrium and temporary protection over roof leaks. 

     

DENTAL SCHOOL AUDITORIUMS A & B RENOVATIONS:

  • The contractor installed carpet at the stairwell entrances of Auditoriums A and B. 
  • The electrical contractor installed additional conduit and junction boxes for the power outlets in room 4202B.