Louisiana State University Health Sciences Center Administration & Finance
 

WEDNESDAY, MAY 27, 2009

 

1542 TULANE AVE. :

  • The contractor installed door hardware for the double doors of Room 109 and the new door in the 1st Floor lobby area that leads to the basement. 
  • Facility Services continues painting and electrical repairs on the 2nd Floor.

 

EXTERIOR/LANDSCAPING:

  • LSUHSC Facility Services planted shrubs along South Roman St. adjacent to the MEB and installed new tree grates in the sidewalks around the building.

 

LIONS/LSU CLINIC PERMANENT REPAIRS AND MITIGATION:    

  • The electrical contractor removed the old ATS cabinets, wire, and pipe on the 1st Floor and began testing the new fire pump. 
  • The mechanical contractor installed roof drains strainers on new stairwell. 
  • The contractor installed 5th and 6th Floor magnetic door holders at the stairwell.
    • They painted the 1st Floor CSRB side door frames and the 1st Floor walls of the new stairwell.
    • Workers continued to install the ceiling in the computer lounge of the 6th Floor.

 

LIONS BUILDING 8th FLOOR NETWORK CLOSET:

  • The contractor removed walls of the network closet.

 

RESIDENCE HALL LOBBY EXPANSION:

  • The floor contractor sealed and covered the floor in the expanded lobby area. 

 

LIBRARY COMMONS:

  • The contractor framed the stairwell wall on the 4th Floor.

 

MEB AIR HANDLING UNIT REPLACEMENT:

  • Facility Services continued staging temporary air conditioning units to support the temporary air conditioning for 6th and 7th Floor Quadrant D.

 

MEB 2ND FLOOR LOBBY RENOVATIONS:

  • The contractor began installing the metal wall panel trim in front of Lecture Hall B.

 

MEB MDL 3 RENOVATIONS:

  • The contractor completed installing sheetrock and insulation around the steel track.
  • The contractor disconnected receptacles and removed ceiling grid and tiles in the corridor where the alcove is being built for the copy machine.

 

MEB PHARMACOLOGY LAB RENOVATIONS:

  • The contractor continued working on general cleaning in the lab area.

 

ALLIED HEALTH/NURSING RE-ROOFING PROJECT:

  • The contractor installed base sheet along the parapet wall on the S. Roman St. side of the roof. 
  • The contractor began installing the pitch pan for the exhaust fan on the loading dock side of building.

     

DENTAL SCHOOL AUDITORIUMS A & B RENOVATIONS:

  • The contractor finished installing additional framing and acoustical wall panels in Auditorium A along the east and west walls. 
    • The north wall and wing wall remain unfinished.
  • The electrical contractor installed conduit for the lectern in Auditorium B.