The contractor worked on punch-list items: removing paint overspray in the upper level of the auditorium and capping plumbing lines in the old section.
LSUHSC Facility Services continues painting in Suite 235 .
EXTERIOR/LANDSCAPING:
LSUHSC Facility Services prepared planting beds along Bolivar St. adjacent to the Residence Hall and continued installing new tree grates around the MEB.
LIONS/LSU
CLINIC PERMANENT REPAIRS AND MITIGATION:
The contractor certified the fire pump and it is now in service.
LIONS BUILDING
8th FLOOR NETWORK CLOSET:
The contractor continued framing studs and installing sheetrock.
LIBRARY
COMMONS:
The restoration specialist continued repairing the frieze.
The contractor continued framing and installing sheetrock for the center stairwell wall.
MEB
AIR HANDLING UNIT REPLACEMENT:
LSUHSC Facility Services completed staging temporary air conditioning units to support the temporary air conditioning for 6th and 7th Floor Quadrant D.
MEB
MDL #3 RENOVATIONS:
The contractor framed the stud walls for the alcove area across from MDL #5.
MEB
PHARMACOLOGY LAB RENOVATIONS:
The contractor continued working on general cleaning in the lab area.
ALLIED
HEALTH/NURSING RE-ROOFING PROJECT:
The contractor began to installing the cap sheet on the main roof on the Bolivar street side.
They continued installing pitch pan for exhaust fan on the Bolivar street side.
DENTAL SCHOOL
AUDITORIUMS A & B RENOVATIONS:
The electrical contractor set the floor boxes for the lecterns in both auditoriums.
The contractor installed additional acoustical panels in Auditorium A along the wing walls.