Louisiana State University Health Sciences Center Administration & Finance
 

TUESDAY, MAY 5, 2009

 

1542 TULANE AVE. :

  • The general contractor continued touching up the paint in the auditorium. 
  • The furniture vendor completed the installation of furniture in all of 3rd Floor offices.
  • LSUHSC Facility Services continued making electrical repairs and painting on the 2nd and 3rd Floors.
    • They patched and painted Room 312B. 

 

LIONS/LSU CLINIC PERMANENT REPAIRS AND MITIGATION:    

  • The contractor repaired the wall by the switchgear room following the installation of new fire pump breaker.
    • Workers installed restroom partitions and ceiling grid in the facilities on the Bolivar St. side of the 1st Floor.
    • Ceiling tile is being installed on the 1st Floor, CSRB/S. Prieur Street side.
    • Crews applied the 2nd coat of epoxy in the mechanical and electrical rooms on the 1st Floor, Bolivar Street side.
    • They plastered the new wall in the old PBX room on the 1st Floor.
    • Workers installed wall tile on the Bolivar St. side of the 1st Floor.
    • The contractor installed floor tile on the 6th Floor in the computer lounge for the new floor boxes.
    • A crew continued to install metal for the mullions in the stairwell.
    • The stairwell handrails on the 3rd through the 6th levels of the exterior stairwell were painted.
  • The electrical contractor placed the new breakers for the fire pump motor on the roof and on the 2nd Floor.

 

LIBRARY COMMONS:

  • The contractor patched and repaired the elevator lobby ceiling.
  • They relocated lights in the wooden ceiling and installed the ceiling frame in the back office area. 

 

RESIDENCE HALL LOBBY EXPANSION:

  • The interior contractor continued patching walls throughout the lobby area. 
  • They installed gypsum board to fur out the concrete wall in the back corner lobby area along S. Roman St. and Poydras Ave.
  • Gypsum board was hung in the network closets.

 

MEB 2nd FLOOR LOBBY RENOVATIONS:

  • The contractor installed glazing for the new windows in Campus Office Stores and Medical Center Stores.
  • They continue to finish the interiors of the stores.
  • The wall panel contractor continued installing wall panels on the Campus Office Stores side of the lobby.

 

MEB PHARMACOLOGY LAB RENOVATIONS:

  • The contractor completed installing ceiling tiles in the administrative area.
    • They continue installing ceiling tiles in the lab areas.
  • The network wiring contractor continued pulling network wires. 

 

ALLIED HEALH/NURSING RE-ROOFING PROJECT:

  • The contractor continued to work on the roof slope on the walkway roof between the Allied Health/Nursing Bldg. and the MEB.     

 

DENTAL SCHOOL AUDITORIUMS A & B RENOVATIONS:

  • The contractor continues installing the ceiling tiles in Auditorium A.
  • The electrical contractor pulled wires for the electrical transformers and panels in Auditorium B.