Louisiana State University Health Sciences Center Administration & Finance
 

WEDNESDAY, MAY 6, 2009

 

1542 TULANE AVE. :

  • The general contractor started cleaning the auditorium floor.
  • Facility Services continued making electrical repairs and painting on the 2nd and 3rd Floors.
    • They patched and painted Room 312B. 

 

LIONS/LSU CLINIC PERMANENT REPAIRS AND MITIGATION:    

  • The contractor installed flashing on the stairwell roof.
    • A French drain was installed around the new stairwell slab.
    • Workers continued to install restroom partitions on the Bolivar St. side of the 1st Floor.
    • A crew applied epoxy in the old PBX room on the 1st Floor.
    • They continue installing wall tile on the Bolivar St. side of the 1st Floor.
    • Crews continued to install metal for the mullions in the stairwell.
    • Workers painted the stairwell handrail on the 1st through 3rd Floors.
  • The electrical contractor installed a 600 amp breaker for EMDP panel and the 1600 amp breaker for the fire pump motor on the roof.
    • They installed smoke detectors and strobes on the Bolivar St. side of the 1st Floor.

 

LIBRARY COMMONS:

  • The contractor continued to patch and repair the elevator lobby ceiling.
  • Additional lights were relocated in the wooden ceiling.
  • Workers are installing the ceiling frame in the back office area.

 

MEB AIR HANDLING UNIT REPLACEMENT:

  • The contractor removed the old rooftop unit number one, installed the new unit and patched the roof.
  • They began piping the new unit and making connections to the existing ductwork.

 

RESIDENCE HALL LOBBY EXPANSION:

  • The interior contractor continued installing gypsum board to fur out the concrete wall in the back corner lobby area on S. Roman St. and Poydras Ave.
  • The interior contractor ran wires for the fire alarm devices throughout the lobby area.
  • The mechanical contractor raised one sprinkler line underneath the mezzanine level between the B & C Towers .
    • They adjusted sprinkler heads to the center tile of the drop ceiling.

 

MEB 2nd FLOOR LOBBY RENOVATIONS:

  • The wall panel contractor installed metal trim pieces for the wood wall panels adjacent to the elevators.

 

MEB PHARMACOLOGY LAB RENOVATIONS:

  • The contractor completed installing ceiling tiles in the in the lab areas.
  • The contractor installed return air grilles in the new doors. 
  • The network wiring contractor continued pulling network wires. 

 

ALLIED HEALTH/NURSING BLDG. RE-ROOFING PROJECT:

  • The contractor installed a cap sheet on the roof of the walkway between the Allied Health/Nursing Bldg. and the MEB.
  • They installed the cap sheet on the 4th Floor lower level roofs.     

 

DENTAL SCHOOL AUDITORIUMS A & B RENOVATIONS:

  • The contractor installed an additional row of ceiling tiles in Auditorium A.
  • The contractor installed carpet on the top two tiers of Auditorium A.