Louisiana State University Health Sciences Center Administration & Finance
 

THURSDAY, JUNE 11, 2009

 

1542 TULANE AVE. :

  • The contractor continued working on the AHU in Suite 123 .
  • Facility Services continued applying touch-up paint in 2nd Floor offices.
  • The contractor continued insulating fan coil piping in offices on the 2nd Floor.
  • The terrazzo contractor applied the final polish on the 1st and 2nd Floors.

 

EXTERIOR/LANDSCAPING:

  • Facility Services completed installing irrigation piping and wiring on Bolivar Street beside the Residence Hall.

 

LIONS/LSU CLINIC PERMANENT REPAIRS AND MITIGATION:

  • The electrical contractor completed removing old underground wires between the switchgear and the generator and sealed the conduit.
  • The contractor installed the 1st Floor security desk and welded the toe kicks of the stairwell.

 

LIONS BUILDING 8th FLOOR NETWORK CLOSET:

  • The contractor applied a second coat of paint on the exterior and interior walls

 

CSRB WALKWAY STOREFRONT DOOR:

  • The contractor ran power to walkway door.

 

RESIDENCE HALL 2ND FLOOR LOBBY EXPANSION:

  • The contractor continued taping and floating walls in the back corner lobby area of the A and C Towers.  
  • The contractor demolished the ceiling and lights in the recreation room.

 

ALLIED HEALTH/NURSING RE-ROOFING PROJECT:

  • The contractor installed galvanized furring (hatch channel) on the parapet wall above the loading dock area.

 

LIBRARY COMMONS:

  • The contractor completed the installation of the sheetrock in the stairwell and installed two access panels in the restroom closet.

 

MEB AIR HANDLING UNIT REPLACEMENT:

  • Facility Services continues to monitor and make adjustments to the temporary air conditioning units for the 6th and 7th Floors Quadrant D.
  • The contractor started AHU 6D and began to test and balance the unit.

 

MEB 2nd FLOOR LOBBY RENOVATIONS:

  • The contractor installed wall panels on the left side of Lecture Hall B.

 

MEB MDL #3 RENOVATIONS:

  • The contractor completed installing ceiling grids in the main MDL room.
  • Crews patched and prepped floor for tile installation. 
  • They installed wall tiles in the alcove area across from MDL 5.

 

DENTAL SCHOOL AUDITORIUMS A & B RENOVATIONS:

  • The contractor installed acoustical panels on the wing wall of Auditorium B. 
  • The controls contractor wired final connections of the AHU sensors to the controller in the AHU room. 
  • The electrical contractor installed and wired the controller, disconnects, and emergency shut-off for the Liebert units.

 

DENTAL SCHOOL PARKING LOT AND ROAD REPAIRS:

  • The contractor completed pavement marking and setting wheel stops for Parking Lots 2 and 6. 
  • Facility Services straightened wheel stops in the student parking lot along Campus Road .