The contractor fabricated the wood forms for the installation of bollard lights along Tulane Ave.
The contractor continued working on punch-list items; capping plumbing lines on Floors 2, 3, 4, and 5 in the rear section of the building.
The insulation contractor insulated fan coil pipes on the 2nd and 3rd Floors.
Facility Services continues to install and connect fan coils in offices on Floors 2, 3, and 4.
EXTERIOR/LANDSCAPING:
Facility Services installed sod in front of the Allied Health/Nursing Building.
LIONS/LSU
CLINIC PERMANENT REPAIRS AND MITIGATION:
The contractor removed the old generator and switchgear from the building and placed the new fuel tank.
LIONS BUILDING
8th FLOOR NETWORK CLOSET:
The contractor continued framing and installing sheetrock.
LIBRARY
COMMONS:
The contractor continued framing and installing sheetrock for the center stairwell wall.
Carpet was installed in the back office area.
RESIDENCE
HALL 2ND FLOOR LOBBY EXPANSION:
The contractor removed a portion of a wall and a door near the A Tower lobby area to create an encased opening corner near Roman St. and the parking lot.
MEB
AIR HANDLING UNIT REPLACEMENT:
Facility Services continues to monitor and make adjustments to the temporary air conditioning units for the 6th and 7th Floor Quadrant D.
The contractor continued installing duct work for AHU 6D and 7D.
MEB
2nd FLOOR LOBBY RENOVATIONS:
The contractor began installing metal wall panels near Lecture Hall B.
MEB
MDL #3 RENOVATIONS:
The contractor continued installing sheetrock for the alcove area across from MDL #5.
MEB
PHARMACOLOGY LAB RENOVATIONS:
The contractor continued installing the cubicles in the administrative area.
The contractor patched the terrazzo floor.
DENTAL SCHOOL AUDITORIUMS A
& B RENOVATIONS:
The electrical contractor installed wiring for fire alarm devices in the 4th Floor elevator lobby and the 4th Floor walkway.
Fire alarm devices were installed in Auditorium A.
The contractor installed additional framing for the acoustical wall panels along the rear and side walls in Auditorium B.
The A/V contractor installed fans and auxiliary outlets for their equipment racks in Room 4202B.
DENTAL SCHOOL
PARKING LOT AND ROAD REPAIRS:
The contractor continued making repairs to Parking Lots 2 and 6.
Work has started on the repairs to the Moss Street entrance driveway.