  • The contractor poured concrete pads for the base of bollard lights along Tulane Ave.
  • The insulation contractor insulated fan coil pipes on the 2nd Floor.
  • Facility Services continues to install and connect fan coils in offices on Floors 2, 3, and 4.
  • The contractor installed the sink for the 2nd Floor lounge.

 

EXTERIOR/LANDSCAPING:

  • Facility Services continued installing irrigation piping along Bolivar Street beside the Residence Hall.
  • Facility Services continued setting sandbags, emergency generators and fuel tanks in preparation for hurricane season.

 

LIONS/LSU CLINIC PERMANENT REPAIRS AND MITIGATION:    

  • The contractor electrically connected the emergency fuel pump and installed the fire pump control wires to the fire alarm panel.
  • The mechanical contractor began piping the fuel lines to the new fuel tank. 
  • The contractor installed the new door and frame on the 2nd Floor CSRB side and installed the door to the mechanical room and the transom above the electrical room door on the 6th Floor Bolivar Street side.

 

LIONS BUILDING 8th FLOOR NETWORK CLOSET

  • The contractor completed installing sheetrock and began taping and floating the walls.

 

LIBRARY COMMONS:

  • The art restorer applied a new finish to the frieze.
  • The contractor installed carpet in the front entrance of the Library.

 

RESIDENCE HALL 2ND FLOOR LOBBY EXPANSION:

  • The contractor completed roughing in the track light in the expanded lobby area. 
  • The contractor installed gypsum board for the ceiling beneath the mezzanine between A & B Towers .

 

ALLIED HEALTH/NURSING RE-ROOFING PROJECT:

  • The contractor installed the cap sheet on the S. Roman Street side of the main roof.

 

MEB AIR HANDLING UNIT REPLACEMENT:

  • Facility Services continues to monitor and make adjustments to the temporary air conditioning units for the 6th and 7th Floor Quadrant D.
  • The contractor completed installation of the condensate drain piping, duct sealing and sheet metal connections for AHU 6D. 
    • Work continues piping chilled water lines, piping heating hot water lines, connecting the motor, mounting variable flow devices, installing sprinkler pipe, and connecting building automation controls for AHU 6D.
  • The contractor completed piping chilled water lines, duct sealing and sheet metal connections, and installation of condensate drains for AHU 7D. 
    • Work continues piping heating hot water lines, connecting the motor, mounting variable flow devices, installing sprinkler pipe, and connecting building automation controls for AHU 7D.

 

MEB 2nd FLOOR LOBBY RENOVATIONS:

  • The contractor continued installing metal and wood wall panels by Lecture Hall B.

 

MEB MDL #3 RENOVATIONS:

  • The contractor patched terrazzo floor in the alcove area.
  • The contractor began installing track for the new partition panels.

 

MEB PHARMACOLOGY LAB RENOVATIONS:

  • The contractor installed fume hood covers near the ceiling.
  • The contractor began honing the terrazzo patches. 

 

DENTAL SCHOOL AUDITORIUMS A & B RENOVATIONS:

  • The contractor installed acoustical panels on the north wall of Auditorium A and installed additional framing along the wing walls. 
  • The contractor installed door hardware for the stairwell entry doors in both auditoriums.
  • The electrical contractor installed the wall-mounted light fixture bulbs and lens covers, and energized the wall fixtures in Auditorium A.

 

DENTAL SCHOOL PARKING LOT AND ROAD REPAIRS:

  • Contractor began paving Parking Lots 2 and 6.
  • Crews continued making repairs to the Moss Street entrance driveway.
  • They made repairs to two damaged water lines.