The contractor placed additional concrete pads for the base of bollard lights along Tulane Avenue .
Facility Services continues to install and connect fan coils in offices on the 2nd Floor.
Carpenters are repairing the damaged section of built-in bookcases in Room 235N.
The contractor insulated piping for 3rd Floor fan coils.
EXTERIOR/LANDSCAPING:
Facility Services continued setting sandbags in preparation for hurricane season.
LIONS/LSU
CLINIC PERMANENT REPAIRS AND MITIGATION:
The contractor removed the old fire pump controller panel and breakers from the 1st Floor, CSRB side.
Data lines were terminated in the network closet on the 6th Floor.
The mechanical contractor continued piping the fuel lines to the new fuel tank.
LIONS BUILDING
8th FLOOR NETWORK CLOSET:
The contractor completed continued taping and floating the network closet.
LIBRARY
COMMONS:
The contractor replaced ceiling panels above the coffee kiosk.
The contractor dismantled the wall by the stairwell.
RESIDENCE
HALL 2ND FLOOR LOBBY EXPANSION:
The interior contractor installed gypsum board on the expanded lobby area ceiling.
They removed existing pull stations by all three elevators.
The mechanical contractor installed diffusers along the new storefront wall.
ALLIED
HEALTH/NURSING BLDG RE-ROOFING PROJECT:
The contractor installed aluminum flashing along the Bolivar Street side of the roof.
MEB
AIR HANDLING UNIT REPLACEMENT:
LSUHSC Facility Services continues to monitor and make adjustments to the temporary air conditioning units for the 6th and 7th Floors Quadrant D.
The contractor completed the installation of the chilled water and sprinkler piping and the condensate drains.
They installed one air flow monitoring station on AHU 6-D.
Work continued on heating hot water lines, mounting variable flow devices, and connecting building automation controls for AHU 6D.
The contractor completed and tested chilled water and heating hot water piping, completed installing sprinkler piping and installed two air flow monitoring stations on AHU-7D.
Work continues connecting the motor, mounting variable flow devices, and connecting building automation controls for AHU 7D.
MEB
2nd FLOOR LOBBY RENOVATIONS:
The contractor installed metal and wood wall panels by Lecture Hall A.
MEB
MDL #3 RENOVATIONS:
The contractor taped and floated walls in the alcove area.
The contractor continued installing track for the new partition panels.
DENTAL SCHOOL
AUDITORIUMS A & B RENOVATIONS:
The contractor installed acoustical panels on the west wall of Auditorium B and installed additional framing along the wing walls.
The AV contractor pulled wiring into the AV racks in Room 4202B.
The electrical contractor installed fire alarm devices in Auditoriums A, B, and C.