The contractor constructed wood forms and installed wiring and conduit for the up-lighting along Tulane Ave.
The contractor relocated the emergency release mechanism for the roll-up gate in the parking garage.
The contractor insulated piping for 2nd Floor fan coils.
EXTERIOR/LANDSCAPING:
Facility Services continued setting sandbags in preparation for hurricane season.
LIONS/LSU
CLINIC PERMANENT REPAIRS AND MITIGATION:
The mechanical contractor continued piping the fuel lines to the new fuel tank.
LIONS BUILDING
8th FLOOR NETWORK CLOSET:
The contractor completed continued taping and floating the network closet.
RESIDENCE
HALL 2ND FLOOR LOBBY EXPANSION:
The interior contractor installed gypsum board on the mezzanine ceiling between the A and B Towers.
The contractor installed sheetrock for the network closet.
The contractor taped and floated the gypsum board ceiling in the expanded lobby area.
ALLIED
HEALTH/NURSING BLDG RE-ROOFING PROJECT:
The contractor installed aluminum flashing along the Gravier St. side of the roof.
The contractor installed the white cap sheet along S. Roman Street .
MEB
AIR HANDLING UNIT REPLACEMENT:
Facility Services continues to monitor and make adjustments to the temporary air conditioning units for the 6th and 7th Floors Quadrant D.
The contractor completed installation of the heating hot water piping on AHU 6-D.
Work continued on installing pipe supports, mounting variable flow devices, and connecting building automation controls for AHU 6D.
The contractor continued connecting the motor, mounting variable flow devices, installing pipe supports and connecting building automation controls for AHU 7D.
MEB
2nd FLOOR LOBBY RENOVATIONS:
The contractor installed metal and wood wall panels by Lecture Hall A.
MEB
MDL #3 RENOVATIONS:
The contractor completed installation of the track for the new partition panels.
DENTAL SCHOOL
AUDITORIUMS A & B RENOVATIONS:
The contractor installed additional acoustical panels on the north and west walls of Auditorium B and installed additional framing along the wing walls.
The AV contractor continued pulling wire into the AV racks in Room 4202B.
The contractor fire sealed the gypsum walls above the ceiling in Rooms 4202B and 4202C.
Workers installed ceiling tile in Room 4202C.
DENTAL SCHOOL
PARKING LOT AND ROAD REPAIRS:
The contractor completed paving Parking Lots 2 and 6.
They continued making repairs to the Moss Street entrance driveway.
Crews built the concrete forms for various concrete road and apron repairs.