Louisiana State University Health Sciences Center Administration & Finance
 

FRIDAY, JULY 10, 2009

 

1542 TULANE AVE. :

  • Facility Services is applying touch-up paint in the 1st Floor offices.
  • Facility Services custodial staff vacuumed additional rooms along the center corridor on the 2nd Floor.

 

EXTERIOR/LANDSCAPING:

  • Facility Services continues to install the sprinkler system on the Tulane Ave. side of the Roman St. Garage.  

 

ALLIED HEALTH/NURSING RE-ROOFING PROJECT:

  • The contractor installed lighting protection rods on the Stairwell C penthouse. 
  • Workers continued installing flashing around the exhaust fans.

 

LIONS/LSU CLINIC PERMANENT REPAIRS AND MITIGATION:

  • The contractor continued pulling network cables for the conference rooms on the CSRB side of the 6th Floor.

 

LIBRARY COMMONS:

  • The contractor continued installing the handrail in the stairwell.

 

RESIDENCE HALL 2nd FLOOR LOBBY EXPANSION:  

  • The contractor removed the existing corner guards.
  • Workers continued taping and floating walls throughout the lobby. 
  • The flooring contractor continued installing porcelain bases between the A & B Towers .

 

MEB AIR HANDLING UNIT REPLACEMENT:

  • Facility Services continues shifting temporary AC units from the C Quadrant on the 6th and 7th floor to the B Quadrant (corner of Perdido Street and South Roman Street ).
  • The contractor continues installing piping, insulation, electrical and controls for AHU 6C.

 

MEB MDL #3 RENOVATIONS:

  • The network contractor continued running network wires for the casework.

 

DENTAL SCHOOL AUDITORIUMS A & B RENOVATIONS:

  • The A/V contractor installed the auto-stack camera for the projectors in Auditorium A.
  • The general contractor continued pulling wires and touched up paint in Auditorium A. 
  • The electrical installed electrical outlets for the podiums.