DENTAL SCHOOL EXHAUST FAN REPLACEMENT:  A new project to replace the old exhaust fans on the Clinic Building and the Power Plant began on Saturday, July 11th.  A crane was set up in the horseshoe to lift the fans onto the roof of the Clinic Building .

  • As each fan is replaced, the fume hoods affected will be out of service.  It is important that lab occupants take the necessary precautions with any chemicals since there will be no exhaust in the affected rooms during this work.  The entire schedule is as follows: 
    • July 13th:  8:00 AM thru 4:30 PM.   Fans F13 and F14 will be replaced; affecting fume hoods in 7315 and 6313.      
    • July 14th:  8:00 AM thru 4:30 PM.  Fans F17 and F18 will be replaced; affecting fume hoods in 6329 and 6335. 
    • July 15th:  8:00 AM thru 4:30 PM.  Fans F20 and F22 will be replaced; affecting fume hoods in 7339 and 7333. 
    • July 16th:  8:00 AM thru 4:30 PM.  Fans F62 and F39 will be replaced; affecting fume hoods in 7325 and 7323. 
    • July 17th:  8:00 AM thru 4:30 PM.  Power House ventilator will be replaced; affecting the Power House. 
    • July 20th:  8:00 AM thru 4:30 PM.  Restrooms exhaust fans on 3rd Floor of the Clinic Building will be replaced. 
    • July 25th:  8:00 AM thru 2:00 PM.  The crane will be in the horseshoe to remove old fans from roof    

 

1542 TULANE AVE. :

  • Facility Services is applying touch-up paint in the 1st Floor offices.
  • The contractor completed cleaning all 2nd Floor offices and stairwells.
    • They continue cleaning the 2nd Floor restrooms.
  • The furniture contractor installed furniture in the 1st Floor offices. 
  • The flooring contractor installed carpet squares near Room 235L. 

 

EXTERIOR/LANDSCAPING:

  • Facility Services replanted the beds in front of the Allied Health/Nursing Building following the repair of a leaking water line on Saturday, July 11.
  • Crews continued installing sprinklers around the Roman Street Garage. 

 

ALLIED HEALTH/NURSING RE-ROOFING PROJECT:

  • The contractor installed aluminum flashing around the parapet wall on the Atrium.   

 

LIONS/LSU CLINIC PERMANENT REPAIRS AND MITIGATION:

  • The contractor pulled electrical cables for the MRI trailer feed on the 1st Floor.
  • They drilled the holes for the flood gates in the 1st Floor elevator lobby.

 

LIBRARY COMMONS:

  • The contractor completed the installation of the stairwell handrail and installed carpet at the main entry. 
  • LSUHSC installed the cash register and coffee maker.

 

RESIDENCE HALL 2nd FLOOR LOBBY RENOVATIONS:  

  • The contractor trimmed out the electrical floor boxes at both ends of the lobby.
  • The contractor sanded the new walls and ceiling in the recreation room.

 

MEB AIR HANDLING UNIT REPLACEMENT:

  • Facility Services completed shifting temporary AC units to the B Quadrant (corner of Perdido Street and South Roman Street ).
  • The contractor demolished and removed the old air handling units 6B and 7B.
  • They installed new ductwork and new AHU 6B.

 

MEB MDL #3 RENOVATIONS:

  • The network contractor terminated end connectors for network cables in the new casework.
  • The casework contractor continued installing the remaining cantilever frame and countertops.
  • The contractor removed the door and door frame leading to Room 4110.

 

DENTAL SCHOOL AUDITORIUMS A & B RENOVATIONS:

  • The A/V contractor installed speaker grilles in Auditoriums A and B and wired the components in Auditorium B.