Louisiana State University Health Sciences Center Administration & Finance
 

THURSDAY, JULY 16, 2009

 

1542 TULANE AVE. :

  • Facility Services is applying touch-up paint in the 2nd Floor offices along Tulane Ave.
  • Facility Services installed cover-plates over the electrical floor boxes in the Auditorium.
  • The network installers installed wiring for wireless services in the conference room on the 1st Floor. 

 

EXTERIOR/LANDSCAPING:

  • Facility Services continued installing sprinklers on the Tulane Avenue side of the Roman Street Garage. 

 

LIONS/LSU CLINIC PERMANENT REPAIRS AND MITIGATION:

  • The Fire Marshal inspected the project and granted occupancy contingent on the correction of some minor deficiencies. 
  • The contractor finished installing the flood gates for Elevators 2 and 3.
  • They pulled data wire on the 5th Floor, S. Prieur Street side.

 

RESIDENCE HALL 2nd FLOOR LOBBY RENOVATIONS:  

  • The millwork contractor continued installing wood cladding around the mailboxes.
  • The interior contractor continued patching walls throughout the lobby.
  • The contractor adjusted the sprinkler heads in the special ceiling system.

 

MEB PHARMACOLOGY LAB RENOVATIONS:

  • The casework contractor installed switches at each fume hood in both the admin and lab area. 

 

MEB AIR HANDLING UNIT REPLACEMENT:

  • Facility Services continued monitoring and adjusting temporary AC units for the B Quadrant (corner of Perdido Street and South Roman Street ).
  • The contractor continued installing new ductwork and piping for air handling unit 6-B and 7-B.

 

MEB 7th FLOOR PHYSIOLOGY LAB RENOVATIONS:

  • The contractor continued removing existing casework, plumbing, and electrical.

 

DENTAL SCHOOL AUDITORIUMS A & B RENOVATIONS:

  • The contractor installed network terminals in both auditoriums. 
  • The A/V contractor installed the cameras and projection screen in Auditorium B. 
  • The contractor also connected wiring for the touch-screen panels at the podium in both auditoriums.