The cleaning contractor cleaned Stairwells 3 and 5 and the 2nd Floor bathrooms.
Facility Services installed electrical whips for the cubicles on the 2nd Floor.
The lighting contractor installed exit lights in the auditorium.
ALLIED
HEALTH/NURSING RE-ROOFING PROJECT:
The contractor installed the parapet wall cap along the Bolivar and Perdido St. sides of the roof.
They installed counter flashing around the exhaust fans near Bolivar Street .
LIONS
EYE DOOR REPLACEMENT
The contractor removed existing swinging door.
LIBRARY
COMMONS:
The contractor painted the second coat in the restroom closets.
MEB
2nd FLOOR RENOVATIONS:
The contractor tested the fire alarm devices.
LIONS/LSU
CLINIC PERMANENT REPAIRS AND MITIGATION:
The contractor continued pulling network wires for the conference room along Bolivar Street .
RESIDENCE
HALL 2nd FLOOR LOBBY RENOVATIONS:
The contractor continued installing the wavy ceiling grid in the expanded lobby area.
Crews roughed in the recess down-light fixtures in the recreation room.
MEB
AIR HANDLING UNIT REPLACEMENT:
Facility Services continues to monitor and adjust the C quadrant 6th and 7th floor temporary units.
The contractor completed piping and insulating air handling unit (AHU) 7C and continues installing piping, insulation, electrical and controls for AHU 6C.
MEB
MDL #3 RENOVATIONS:
The A/V contractor installed 42†LCD TV and ran wires for the control panel.
The contractor continued connecting air, gas, and vacuum to the fixtures and trimming out the receptacles for the casework.
DENTAL SCHOOL
AUDITORIUMS A & B RENOVATIONS
The A/V contractor installed cameras for the speaker and audience in Auditorium A.
The contractor moved the roof drain cleanout located near the projector.
They continued pulling network wires and terminating them in Auditorium B.