Facility Services continues to make miscellaneous electrical repairs on the 2nd Floor.
Facilitiy Services custodial staff vacuumed the rooms along the main corridor on the 2nd Floor.
EXTERIOR/LANDSCAPING:
Facility Services continues the installation of the sprinkler system on the Tulane Ave. side of the Roman St. Garage.
ALLIED HEALTH/NURSING RE-ROOFING PROJECT:
The contractors finished installing the cap on the parapet wall.
The contractor installed flashing around the exhaust fans for the elevator penthouse.
LIONS/LSU CLINIC PERMANENT REPAIRS AND MITIGATION:
The contractor continued pulling network wires for the 6th Floor conference rooms along the Gravier Street side of the building.
LIBRARY COMMONS:
The contractor completed installing wallpaper on the center wall of the stairwell.
The installation of the cove base is finished.
They began installing the handrail in the stairwell.
RESIDENCE HALL 2nd FLOOR LOBBY EXPANSION:
The contractor taped and floated walls in the corner lobby area of the C Tower.
The flooring contractor installed porcelain bases between the B & C Towers .
Crews continued roughing in the down light fixtures in the suspended ceiling of recreation room.
MEB AIR HANDLING UNIT REPLACEMENT:
Facility Services continued shifting temporary AC units from C Quadrant on the 6th and 7th Floors to the B Quadrant (corner of Perdido Street and South Roman Street ) in preparation for the replacement of the next pair of air handling units.
The contractor continues installing piping, insulation, electrical and controls for AHU 6C.
MEB MDL #3 RENOVATIONS:
The network contractor continued running network wires to the new casework.
The A/V contractor installed control boxes for the audio/visual equipment.
DENTAL SCHOOL AUDITORIUMS A
& B RENOVATIONS:
The A/V contractor continued to pull fiber from the rack room to both auditoriums.
The general contractor continued pulling wires and touched up paint in Auditorium A.