Louisiana State University Health Sciences Center Administration & Finance
 

THURSDAY, JULY 9, 2009

 

1542 TULANE AVE.:

  • Facility Services continues to make miscellaneous electrical repairs on the 2nd Floor.
  • Facilitiy Services custodial staff vacuumed the rooms along the main corridor on the 2nd Floor.

 

EXTERIOR/LANDSCAPING:

  • Facility Services continues the installation of the sprinkler system on the Tulane Ave. side of the Roman St. Garage.  

 

ALLIED HEALTH/NURSING RE-ROOFING PROJECT:

  • The contractors finished installing the cap on the parapet wall.
  • The contractor installed flashing around the exhaust fans for the elevator penthouse.

 

LIONS/LSU CLINIC PERMANENT REPAIRS AND MITIGATION:

  • The contractor continued pulling network wires for the 6th Floor conference rooms along the Gravier Street side of the building.

 

LIBRARY COMMONS:

  • The contractor completed installing wallpaper on the center wall of the stairwell. 
  • The installation of the cove base is finished.
  • They began installing the handrail in the stairwell. 

 

RESIDENCE HALL 2nd FLOOR LOBBY EXPANSION:  

  • The contractor taped and floated walls in the corner lobby area of the C Tower.
  • The flooring contractor installed porcelain bases between the B & C Towers .
  • Crews continued roughing in the down light fixtures in the suspended ceiling of recreation room.

 

MEB AIR HANDLING UNIT REPLACEMENT:

  • Facility Services continued shifting temporary AC units from C Quadrant on the 6th and 7th Floors to the B Quadrant (corner of Perdido Street and South Roman Street ) in preparation for the replacement of the next pair of air handling units.
  • The contractor continues installing piping, insulation, electrical and controls for AHU 6C.

 

MEB MDL #3 RENOVATIONS:

  • The network contractor continued running network wires to the new casework.
  • The A/V contractor installed control boxes for the audio/visual equipment.

 

DENTAL SCHOOL AUDITORIUMS A & B RENOVATIONS:

  • The A/V contractor continued to pull fiber from the rack room to both auditoriums.
  • The general contractor continued pulling wires and touched up paint in Auditorium A.