The plumbing contractor installed the kiosk water lines for the hand wash sink, coffee maker, and espresso machine.
The sprinkler contractor replaced painted sprinkler heads in Room 122H and in the corridor outside 122H.
The electrical contractor wired and installed breakers for the kiosk electrical sub-panel.
The contractor painted the sheetrock ceiling in the 1st Floor lounge.
The contractor placed the wooden forms, rebar, and wire mesh for the concrete repair in Room 122F (Womens restroom).
Facility Services installed the 1st Floor lounge temperature sensor.
DENTAL SCHOOL
AUDITORIUMS A & B RENOVATIONS:
The contractor tested additional network wires installed in Auditoriums A & B.
MEB
AIR HANDLING UNIT REPLACEMENT:
Facility Services continued monitoring and adjusting the temporary A/C units in the A Quadrant (corner of South Roman Street and the MEB loading dock).
The engineer of record accepted RTU 1, RTU 2, AHU 6-D, AHU 7-D, AHU 7-C, AHU 6-B and AHU-7B.
LANDSCAPING:
Crews continued planting along the Tulane Ave. side of the Roman St. Garage.
MEB
2nd FLOOR LOBBY RENOVATIONS:
The contractor installed hidden doors.
MEB
7TH FLOOR PHYSIOLOGY LABS RENOVATIONS:
The contractor patched floor in the walk-in cooler (Room 7206).
The contractor taped and floated the walls below the windows and the soffit in Rooms 7241 & 7250.
RESIDENCE
HALL 2nd FLOOR LOBBY RENOVATIONS:
The furniture contractor continued installing the security desk station and the TV enclosure in the expanded lobby area.
The contractor touched up all walls in the recreation room.
The contractor began the installation of new doors.
RESOURCE CENTER ROOF REPLACEMENT:
The contractor removed and replaced the roof drain bowl near the stairwell penthouse on the Tulane Street side of the roof.