FRIDAY, AUGUST 14, 2009NOTICE: The Medical Education Building Air Handling Unit Replacement project continues. The next two air handling units to be replaced serve the Perdido Street/Bolivar Street corner (quadrant D) of the 4th and 5th floors. Installation of these units will start at 6:00 PM on Friday, August 21st.
The contractor needs to relocate electrical power conduits for these new air conditioning units. Consequently, there will be an electrical outage on Monday, August 17th, from 4:00 AM to 8:00 AM to relocate electrical conduits feeding emergency panel ELD5B. During this outage there will be no power to equipment plugged into emergency power receptacles in 5th floor labs and offices on the Bolivar Street side of the building that are served out of main panel ELD5B. Receptacles are labeled in the labs, identifying the panel that supplies the power to the receptacle.
MEB AIR HANDLING UNIT REPLACEMENT:
MEB 7TH FLOOR PHYSIOLOGY LAB RENOVATIONS:
RESIDENCE HALL 2nd FLOOR LOBBY RENOVATIONS:
RESOURCE CENTER ROOF REPLACEMENT:
ALLIED HEALTH/NURSING BLDG ROOF REPLACEMENT:
|
| Disclaimer | © 2013 LSUHSC | Privacy Policy |